Published By : Admin |
February 15, 2021 | 20:42 IST
Share
Prime Minister Shri Narendra Modi will dedicate to the nation and lay the foundation of key projects of the oil & gas sector in Tamil Nadu on 17th February 2021 at 4:30 PM via video conferencing. Prime Minister will dedicate to the nation the Ramanathapuram – Thoothukudi natural gas pipeline and Gasoline Desulphurisation Unit at Chennai Petroleum Corporation Limited, Manali. He will also lay the foundation stone of Cauvery Basin Refinery at Nagapattinam. These projects will result in substantial socio-economic benefits and will boost the country’s march towards Urja Aatmanirbharta. Governor and Chief Minister of Tamil Nadu, and Union Minister for Petroleum and Natural Gas will also be present on the occasion.
About the Projects
The Ramanathapuram – Thoothukudi section (143 km) of the Ennore- Thiruvallur- Bengaluru- Puducherry- Nagapattinam- Madurai- Tuticorin Natural Gas Pipeline has been laid at the cost of about Rs. 700 crores. It will help utilise gas from ONGC Gas fields and deliver natural gas as feedstock to industries and other commercial customers.
The Gasoline Desulphurisation Unit at Chennai Petroleum Corporation Limited (CPCL), Manali has been constructed at the cost of about Rs. 500 crore. It will produce low sulphur (less than 8 ppm) environment-friendly gasoline, help reduce emission and contribute towards a cleaner environment.
The Cauvery Basin Refinery to be set up at Nagapattinam will have a capacity of 9 million metric tonnes per annum. It will be set up through a Joint Venture of IOCL and CPCL at an estimated project cost of Rs. 31,500 crore. It will produce Motor Spirit and Diesel meeting BS-VI specifications, and Polypropylene as a value-added product.
Cabinet approves infrastructure projects between National Highway-19 and Varanasi Ring Road in Uttar Pradesh worth Rs.14447.64 crore
July 15, 2026
Share
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the development of a Link/Connector Corridor between National Highway-19 (NH-19) and the Varanasi Ring Road with riverbank connectivity along the River Ganga for the decongestion of Varanasi City in Uttar Pradesh. The 46.039 km project, comprising a six-lane elevated main carriageway, an iconic cable-stayed bridge, an extradosed Foot Over Bridge-cum-Major Bridge, loops, ramps, link roads and service roads, will be implemented under the Hybrid Annuity Model (HAM) at a total capital cost of Rs.14,447.64 crore including a civil construction cost of Rs.6,037.85 crore (including utility shifting, excluding GST) and a land acquisition cost of Rs.541.11 crore under NH(O).
The project will provide seamless connectivity between NH-19 and the Varanasi Ring Road, significantly decongesting the city’s road network and improving urban mobility. Designed for an operating speed of 80–100 km/h, it is expected to reduce the average travel time across the project influence area from approximately 60 minutes to 20 minutes, representing a reduction of nearly 67 per cent. Travel time between NH-19 and Kashi Railway Station will be reduced from approximately 50 minutes to about 25 minutes, resulting in a saving of about 25 minutes (nearly 50 per cent).
Aligned with the PM Gati Shakti National Master Plan, the corridor will strengthen multimodal connectivity by providing seamless access to major highways, railway stations, Lal Bahadur Shastri Airport and Ramnagar IWAI Port, while significantly improving connectivity to key religious, educational and cultural landmarks, including the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the Ghats of Varanasi. By linking important economic, social and logistics nodes, the project will improve logistics efficiency, enhance road safety, facilitate tourism and pilgrimage, and support sustainable regional economic growth across eastern Uttar Pradesh.
The corridor has been conceived as a transformative urban mobility project to decongest the road network of Varanasi & Chandauli by providing a high-speed, access-controlled connection between NH-19, the Varanasi Ring Road (NH-135B), Ramnagar/ BHU and other major urban destinations. With more than 15 crore tourists and pilgrims visiting Varanasi every year, the project will significantly improve connectivity to major religious, educational and cultural landmarks, including the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort, the Ghats of Varanasi, and Kashi Railway Station, while substantially reducing congestion on the existing city road network. An elevated spur between BHU/Lanka and Samne Ghat will further ease traffic congestion at the heavily trafficked Lanka Junction by separating through traffic from local traffic movements.
The project will improve road safety through controlled-access movement, reduce vehicle operating costs and emissions, enhance travel reliability, and facilitate the efficient movement of passenger and freight traffic. It will also decongest NH-19, the BHU-Ramnagar Corridor and NH-35 by diverting through traffic away from the densely developed urban core.
The project incorporates several landmark engineering features, including an iconic 910 m cable-stayed bridge across the River Ganga, a 1.32 km extradosed Foot Over Bridge-cum-Major Bridge with travelators providing seamless pedestrian connectivity to the Kashi Vishwanath Temple, a Rail Over Bridge over the existing/proposed Malviya Bridge, dedicated emergency parking bays, noise barriers, façade lighting and architectural elements inspired by the cultural heritage of Varanasi. These features will not only improve transportation efficiency but also enhance the city’s urban landscape, create an iconic addition to Varanasi’s skyline, and reinforce its position as one of India’s foremost religious and cultural destinations.
Planned in accordance with the PM Gati Shakti National Master Plan, the corridor will strengthen multimodal connectivity by linking one Economic Node (Chandauli SEZ), one Social Node (Chandauli Aspirational District) and six major Logistics Nodes, namely Lal Bahadur Shastri Airport, Kashi Railway Station, Banaras Railway Station, Varanasi City Railway Station, Pt. Deen Dayal Upadhyay Junction and Ramnagar IWAI Port. By providing seamless connectivity between these transport hubs and key destinations such as the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the Ghats of Varanasi, the project will enhance multimodal integration, improve logistics efficiency, facilitate tourism and pilgrimage, and support sustainable regional economic development across eastern Uttar Pradesh.
Overall, the proposed Ganga Elevated Corridor will create a modern, high-capacity urban transport corridor that transforms mobility in Varanasi by providing faster, safer and more reliable connectivity, significantly reducing congestion, strengthening multimodal integration, enhancing tourism and pilgrimage infrastructure, and supporting sustainable economic growth in line with the vision of PM Gati Shakti and Viksit Bharat.