PM Modi addresses public meeting at Kokrajhar, Assam

Published By : Admin | April 1, 2021 | 11:00 IST
This is an election between the 'maha jhooth' of Mahajot and 'maha vikas' of Double Engine: PM Narendra Modi in Kokrajhar
In Kokrajhar, PM Modi says Assam will show red card to Congress and its allies Yesterday, the entire state of Assam saw in a video how the identity of Assam, the symbol of the hardwork of the women of Assam 'Gamosa' was insulted publicly: PM
People of Assam trust NDA for development and peace, says PM Modi in Kokrajhar
Congress has handed over its 'hand' and fortune to leaders of that party which had pushed Kokrajhar into violence: PM Modi on Cong-AIUDF alliance

Ahead of the third and last phase of assembly elections, Prime Minister Narendra Modi addresses a public rally in Assam's Kokrajhar today. He said, “Football is very popular among youth here. If I have to speak in their language, I would say that the people have yet again shown a Red Card to Congress and its Mahajot. People of Assam trust NDA for development, peace, security of the state.”

Targeting the Congress-led grand alliance named Mahajot, PM Modi said that this is an election between the 'Maha jhooth' of Mahajot and 'Maha Vikas' of Double Engine.

Talking about the land allotment certificates given to the indigenous people, PM Modi stated, “From providing land pattas to over 3.25 lakh families, increase rates of workers to making life of women working in tea gardens, the NDA government has tried to bring all-round development in Assam.” PM Modi alleged that Congress never worked for the upliftment of tea garden workers while the NDA government has increased and doubled their wages.

Attacking Congress and AIUDF alliance, Prime Minister Modi asserted, “Congress has handed over its 'hand' and fortune to leaders of that party which had pushed Kokrajhar into violence. Congress is dreaming of coming to power in Assam with the help of those people whom it had saved for its vote bank.”

“Yesterday, the entire state of Assam saw in a video how the identity of Assam, the symbol of the hardwork of the women of Assam 'Gamosa' was insulted publicly. Everyone who loves Assam is hurt and angry after seeing those pictures,” said PM Modi while speaking in Kokrajhar

Speaking about the centre’s development work, the Prime Minister remarked, “Medical college is being setup in Kokrajhar at a rapid pace. A package of Rs 1,500 crore has also been provided for development.
Bodoland University, Central Institute of Technology, Bodoland Bhawan and several other institutions are becoming the identity of this region.”

“The government of double engine is essential for the continued development of Assam. That is, NDA government at the center and NDA government in the state. When strength of both will be combined, more work will be done,” he added.

The Prime Minister also highlighted that every poor family has been provided toilets, he said, “Now we are working hard on providing clean drinking water. Nearly 4.5 lakh tap water connections have already been provided. From railways, roadways to air connectivity, everything is being improved in this region today. Thousands of houses have been built in Kokrajhar for the poor and needy.”

The Prime Minister expressed confidence that the NDA will form the government in Assam and said people have stamped the victory in the previous phase of polling.

 

Click here to read full text speech

Explore More
ശ്രീരാമജന്മഭൂമി ക്ഷേത്രത്തിലെ പതാക ഉയർത്തൽ ഉത്സവത്തിനിടെ പ്രധാനമന്ത്രി നടത്തിയ പ്രസം​ഗം

ജനപ്രിയ പ്രസംഗങ്ങൾ

ശ്രീരാമജന്മഭൂമി ക്ഷേത്രത്തിലെ പതാക ഉയർത്തൽ ഉത്സവത്തിനിടെ പ്രധാനമന്ത്രി നടത്തിയ പ്രസം​ഗം
Year-ender 2025: From interstellar comets to ISRO’s Bahubali launch — space milestones that stood out

Media Coverage

Year-ender 2025: From interstellar comets to ISRO’s Bahubali launch — space milestones that stood out
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves Rs 1,526.21 crore upgrade of NH-326 in Odisha
December 31, 2025

The Union Cabinet chaired by the Prime Minister Shri Narendra Modi today approved the widening and strengthening of existing 2-Lane to 2-Lane with Paved Shoulder from Km 68.600 to Km 311.700 of NH-326 in the State of Odisha under NH(O) on EPC mode.

Financial implications:

The total capital cost for the project is Rs.1,526.21 crore, which includes a civil construction cost of Rs.966.79 crore.

Benefits:

The upgradation of NH-326 will make travel faster, safer, and more reliable, resulting in overall development of southern Odisha, particularly benefiting the districts of Gajapati, Rayagada, and Koraput. Improved road connectivity will directly benefit local communities, industries, educational institutions, and tourism centres by enhancing access to markets, healthcare, and employment opportunities, thereby contributing to the region’s inclusive growth.

Details:

  • The section of Mohana–Koraput of the National Highway (NH-326) at present have sub-standard geometry (intermediate lane/2-lane, many deficient curves and steep gradients); the existing road alignment, carriageway width and geometric deficiencies constrain safe, efficient movement of heavy vehicles and reduce freight throughput to coastal ports and industrial centres. These constraints will be removed by upgrading the corridor to 2-lane with paved shoulders with geometric corrections (curve realignments and gradient improvements), removal of black spots and pavement strengthening, enabling safe and uninterrupted movement of goods and passengers and reducing vehicle operating costs.
  • The upgradation will provide direct and improved connectivity from Mohana–Koraput into major economic and logistics corridors — linking with NH-26, NH-59, NH-16 and the Raipur–Visakhapatnam corridor and improving last-mile access to Gopalpur port, Jeypore airport and several railway stations. The corridor connects important industrial and logistic nodes (JK Paper, Mega Food Park, NALCO, IMFA, Utkal Alumina, Vedanta, HAL) and education/tourism hubs (Central University of Odisha, Koraput Medical College, Taptapani, Rayagada), thereby facilitating faster freight movement, reducing travel time and enabling regional economic development.
  • The project lies in southern Odisha (districts of Gajapati, Rayagada and Koraput) and will significantly improve intra-state and inter-state connectivity by making vehicle movement faster and safer, stimulating industrial and tourism growth and improving access to services in aspirational and tribal areas. Economic analysis shows the project’s EIRR at 17.95% (base case) while the financial return (FIRR) is negative (-2.32%), reflecting the social and non-market benefits captured in the economic appraisal; the economic justification is driven largely by travel-time and vehicle-operating-cost savings and safety benefits (including an estimated travel-time saving of about 2.5–3.0 hours and a distance saving of ~12.46 km between Mohana and Koraput after geometric improvements).

Implementation strategy and targets:

  • The work will be implemented on EPC mode. Contractors will be required to adopt proven construction and quality-assurance technologies, which may include precast box-type structures and precast drains, precast RCC/PSC girders for bridges and grade separators, precast crash barriers and friction slabs on Reinforced-Earth wall portions, and Cement Treated Sub-Base (CTSB) in pavement layers. Quality and progress will be verified through specialized survey and monitoring tools such as Network Survey Vehicle (NSV), periodic drone-mapping. Day-to-day supervision will be carried out by an appointed Authority Engineer and project monitoring will be conducted through the Project Monitoring Information System (PMIS).
  • The work is targeted to be completed in 24 months from the appointed date for each package, followed by a five-year defect liability/maintenance period (total contract engagement envisaged as 7 years: 2 years construction + 5 years DLP). Contract award will follow after completion of statutory clearances and required land possession.

Major impact, including employment generation potential:

  • This project is aimed at providing faster and safer movement of traffic and improving connectivity between the southern and eastern parts of Odisha, particularly linking the districts of Gajapati, Rayagada, and Koraput with the rest of the State and neighbouring Andhra Pradesh. The improved road network will facilitate industrial growth, promote tourism, enhance access to education and healthcare facilities, and contribute to the overall socio-economic development of the tribal and backward regions of southern Odisha.
  • Various activities undertaken during the construction and maintenance period are expected to generate significant direct and indirect employment opportunities for skilled, semi-skilled and unskilled workers. The project will also boost local industries involved in the supply of construction materials, transportation, equipment maintenance, and related services, thus supporting the regional economy.
  • The project is located in the State of Odisha and traverses three districts — Gajapati, Rayagada, and Koraput. The corridor connects major towns such as Mohana, Rayagada, Laxmipur, and Koraput, providing improved intra-state connectivity within Odisha and enhancing inter-state linkage with Andhra Pradesh through the southern end of NH-326.

Background:

Government has declared the stretch “the Highway starting from its junction with NH-59 near Aska, passing through Mohana, Raipanka, Amalabhata, Rayagada, Laxmipur and terminating at its junction with NH-30 near Chinturu in the State of Odisha” as NH-326 vide Gazette Notification dated 14th August 2012.