Prime Minister reviews rescue and relief operations in areas affected by Cyclone Ockhi
PM announces package of relief measures for cyclone affected States
#CycloneOckhi: PM Modi assures Centre's help, says Union Government stands shoulder to shoulder with them in this hour of crisis
#CycloneOckhi: Centre to dispatch immediate financial assistance worth Rs. 325 crore to cater to the requirements of Kerala, Tamil Nadu and Lakshadweep

The Prime Minister, Shri Narendra Modi, today met and interacted with people, including fishermen and farmers, affected by Cyclone Ockhi, during a visit to the cyclone affected areas of Lakshadweep, Tamil Nadu and Kerala. In the course of the day, the Prime Minister interacted with people in Kavaratti, and Kanyakumari. He also visited Punthura village near Thiruvananthapuram, which is one of the villages that faced the impact of the cyclone. People explained to him, the hardships faced by them on account of the cyclone. The Prime Minister assured the people that all help will be provided  to them and that the Union Government stands shoulder to shoulder with them in this hour of crisis.

The Prime Minister held separate detailed review meetings on the current situation and relief measures, at Kavaratti, Kanyakumari and Thiruvananthapuram. The Governors, Chief Ministers of Kerala and Tamil Nadu, Deputy Chief Minister of Tamil Nadu, Deputy Speaker of Lok Sabha, and Administrator of Lakshadweep along with senior officials were present at the respective meetings.

 

The Prime Minister said that the Union Government will support the cyclone-affected States through a package of relief measures.

  • The Centre will dispatch immediate financial assistance worth Rs. 325 crore to cater to the requirements of Kerala, Tamil Nadu and Lakshadweep.
  • The financial assistance announced by the Prime Minister today, is over and above the assistance of Rs. 280 crore to Tamil Nadu, and Rs. 76 crore to Kerala, disbursed earlier this month, after Cyclone Ockhi hit the two States/UTs.
  • The Government of India will support the reconstruction of approximately 1400 houses fully damaged due to Cyclone Ockhi, on priority, under the Pradhan Mantri Awas Yojana (PMAY). Under this programme, each beneficiary will get upto Rs. 1.5 lakh as support for building a new house.
  • Insurance companies have also been advised to pay the insurance claims of people affected by Ockhi cyclone expeditiously.
  • An ex-gratia assistance of Rs. 2 lakh to the next of kin of the deceased, and Rs. 50,000/- to each of those seriously injured due to the cyclone have been sanctioned under the Prime Minister’s National Relief Fund (PMNRF).

 

Earlier, during the review meetings, the Prime Minister was briefed on the impact of Cyclone Ockhi, the third major cyclone of this kind, to hit this area in the last 125 years. The cyclone hit on November 30, 2017, and  the search and rescue operations, began the same day. So far, a total of 197 ship days involving 20 surface platforms and about 186 flying hours have been utilised by the Indian Coast Guard for search and rescue operations. In addition, a total of 156 ship days and 399 flying hours, involving 10 ships and 7 types of aircraft have been utilised by the Indian Navy. A total of 183 fishermen and civil administration personnel were carried on board these ships to aid in the rescue operations. A total of 845 fishermen have been rescued or assisted till date.

The Prime Minister was informed that the surveillance was carried out even beyond 700 nautical miles from the shore.  

 

Explore More
Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya

Popular Speeches

Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya
India's manufacturing outlook remains resilient despite global headwinds; machine tools, metals and auto lead optimism

Media Coverage

India's manufacturing outlook remains resilient despite global headwinds; machine tools, metals and auto lead optimism
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves a Road Construction project in Uttar Pradesh worth Rs.7145.14 crore
July 01, 2026

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the construction of 117.7 km Kanpur–Kabrai Access-Controlled Greenfield Highway, a four-lane access-controlled corridor with structures designed for future six-laning, forming a key segment of the Bhopal–Kanpur Economic Corridor under the National Highways (O) Programme. With an estimated total capital cost of Rs.7145.14 crore, the project will be implemented by the National Highways Authority of India (NHAI) on BOT (Toll) mode, together with the operation and maintenance of the existing Kanpur-Kabrai section of NH-34.

The project will provide seamless, high-speed connectivity between Kanpur and Kabrai, while strengthening onward connectivity to Sagar, Bhopal and other parts of Madhya Pradesh, thereby creating a modern access controlled economic corridor linking the industrial and commercial centres of Uttar Pradesh with mineral-rich, manufacturing and agricultural regions of Madhya Pradesh thereby improving.

Designed for operating speeds of 80–100 kmph, the corridor will reduce travel time between Kanpur and Kabrai from 3.5 hours to 1.5 hours (58%), while improving road safety, reducing vehicle operating costs and facilitating efficient movement of passenger and freight traffic. The project will also provide strategic connectivity with NH-34, NH-35, the Bundelkhand Expressway, Kanpur Ring Road, and State Highways SH-46, SH-91, SH-10B and SH-42, thereby strengthening integration with the regional highway network. The corridor further strengthen connectivity to the Kabrai mining belt, improving the movement of minerals, industrial goods, construction materials and agricultural produce, thereby enhancing logistics efficiency, supply chain resilience and regional economic development.

Aligned with the PM GatiShakti National Master Plan, the project will improve connectivity to 16 Economic Nodes, including the Unnao, Banther, Pankhi, Rania, Jainpur, Rooma, Chakeri, Sumerpur and Bhuragarh Industrial Areas, Trans Ganga Integrated Township, Growth Centre Jaipur, Kanpur Nagar Node and Bengal Chemicals & Pharmaceuticals Ltd. It will also strengthen connectivity to 9 Social Nodes, namely Fatehpur, Mahoba, Kanpur Zoological Park, Buddha Park, J.K. Temple & Garden, Radha Krishna Temple, Siddheshwar Mahadev Temple, Gopeshwar Mandir and Mahoba Tourist Place, and 10 Logistics Nodes, including Kanpur, Ghatampur, Hamirpur, Mahoba, Kabrai, Bharwa Sumerpur and Banda Railway Stations, together with Kanpur, Chakeri and Khajuraho Airports.

Overall, improve logistics competitiveness, industrial development and economic growth across Bundelkhand and adjoining regions of Uttar Pradesh and Madhya Pradesh, while advancing the objectives of PM GatiShakti.

The project is expected to generate approximately 11,188 direct and 13,985 indirect person-days of employment per lane per km during construction and is projected to carry an Annual Average Daily Traffic (AADT) of about 18,069 Passenger Car Units (PCUs) by FY 2028, underscoring its long-term economic, logistics and transport significance. The proposed project will thus generate close to 1.2 Crore person-days of direct employment and indirect employment.

Map of Corridor: