Published By : Admin |
August 18, 2021 | 17:57 IST
Share
Prime Minister Shri Narendra Modi will inaugurate and lay the foundation stone of multiple projects in Somnath, Gujarat on 20th August at 11 AM via video conferencing. The projects to be inaugurated include the Somnath Promenade, Somnath Exhibition Centre and reconstructed temple precinct of Old (Juna) Somnath. The Prime Minister will also lay the foundation stone of Shree Parvati Temple during the event.
The Somnath Promenade has been developed under PRASHAD (Pilgrimage Rejuvenation and Spiritual, Heritage Augmentation Drive) Scheme at a total cost of over ₹ 47 crore. The Somnath Exhibition Centre, developed in the premises of ‘Tourist Facilitation Centre’, displays the exhibits from dismantled parts of old Somnath temple and its sculptures having Nagar style temple architecture of old Somnath.
The reconstructed temple precinct of Old (Juna) Somnath has been completed by Shree Somnath Trust with a total outlay of ₹ 3.5 crore. This temple is also referred to as Ahilyabai Temple since it was built by Queen Ahilyabai of Indore, when she found that the old temple was in ruins. The entire old temple complex has been holistically redeveloped for the safety of pilgrims and with augmented capacity.
Shree Parvati Temple is proposed to be constructed with a total outlay of ₹ 30 Cr. This will include temple construction in Sompura Salats Style, development of Garbha Griha and Nritya Mandap.
Union Home Minister, Union Tourism Minister along with CM and Deputy CM of Gujarat will be present on the occasion.
Cabinet approves Ahmedabad Metro Rail project Phase 2A (Koteshwar Road to Airport corridor)
June 10, 2026
Share
The Union Cabinet chaired by the Prime Minister Shri Narendra Modi has approved Phase 2(A) of Ahmedabad Metro Rail Project with corridor for a length of 6.032 Km with 05 stations (04 Elevated and 01 underground). On operationalisation of Phase 2(A), Ahmedabad-Gandhinagar will have 77.63 Km of active Metro Rail Network. The names of stations in the Phase 2(A) Corridor are- Ashram Road, Koteshwar Prachin Mandir, Sabarmati River, Sardar Nagar and Airport.
The total completion cost including IDC (Interest during Construction) for the project will be Rs.2,169.04 crore.
Benefits and Bolstering Growth:
The Phase 2(A) of Ahmedabad Metro Rail Project represents a significant advancement in the city’s infrastructure development. Phase 2(A) acts as a major expansion of the Metro Rail Network in the city.
Enhanced Connectivity:
Phase 2(A) of the Ahmedabad Metro Project envisages the development of approximately 6.032 km of new metro corridor, aimed at substantially enhancing public transportation by providing seamless connectivity to the airport and linking key residential and commercial areas that presently lack efficient transit access.
This phase aims to seamlessly integrate key zones, including residential & Commercial hubs with existing Ahmedabad-Gandhinagar corridor. Further, likelihood of sports facilities also being developed in the vicinity for the World Police Games 2029 and Commonwealth Games 2030.
By bridging these vital areas with the metro network, Phase 2(A) will not only enhance connectivity but also stimulate economic activity, tourism, and ease urban mobility for both residents and visitors.
Reduction in Traffic Congestion: Metro Rail as an efficient alternate road transport and with Phase 2(A) as an extension of the Metro Rail network to the Airport, will be particularly impactful inside Ahmedabad. Reduction in road traffic can lead to smoother movement of vehicles, reduction in travel time, increasing overall road safety etc.
Environmental Benefits: With the addition of Phase 2(A) of Ahmedabad Metro Rail Project and increase in overall Metro Rail Network in Ahmedabad & Gandhinagar cities, can significantly reduce carbon emissions compared to traditional fossil fuel-based transport.
Economic Growth: Reduced travel times and improved access to different parts of the city such as Airport, Railway Stations and Bus Depots can enhance productivity by allowing individuals to reach their workplaces and destinations more efficiently. Also, the enhanced connectivity can stimulate local businesses, especially in areas near new metro stations which can also attract investment and development in previously less accessible regions.
Social Impact: The expansion of Phase 2(A) Metro Rail network in Ahmedabad will provide more equitable access to public transport, benefiting diverse socio-economic groups and reducing transport disparities which will contribute to a higher quality of life by reducing commute times and improving access to essential services. The Phase 2(A) of Ahmedabad Metro Rail Project is set to be a transformative development for the city. It promises to deliver enhanced connectivity, reduced traffic congestion, environmental benefits, economic growth, and improved quality of life. By addressing key urban challenges and providing a foundation for future expansion, Phase 2(A) will play a crucial role in shaping the city's development trajectory and sustainability.
The Ahmedabad Metro Phase 2A will generate employment of around 2,000 persons during the peak period of construction activity and 500 persons are likely to work during Operation & Maintenance of the system.