Published By : Admin |
December 21, 2015 | 14:42 IST
Share
PM Narendra Modi flags off e-bus for Parliament
"Mission Innovation" launched jointly by US, France & India to work towards development of green technologies #COP21
Creation of the International Solar Alliance of countries blessed with abundant sunlight a significant initiative, says PM Modi #COP21
PM Modi exhorts entrepreneurs to work towards producing cheap and efficient electric batteries in India
The Prime Minister, Shri Narendra Modi, today attended a function at Parliament House, for the unveiling and demonstration of a retrofit electric bus. The bus has been converted from a diesel bus to a battery-operated electric bus. This is an initiative of the Ministry of Road Transport and Highways, to provide clean, pollution-free transport for Members of Parliament.
The Prime Minister briefly visited the bus, and handed over the key of the bus to the Speaker of the Lok Sabha, Smt. Sumitra Mahajan.
Speaking on the occasion, the Prime Minister said that the environment had been a topic of discussion for long, but in recent times, the impact of damage to the environment is being felt by the common man.
The Prime Minister recalled the recent CoP-21 Summit at Paris, and talked about two significant initiatives taken there. One of these was "Mission Innovation," launched jointly by US, France and India, with the help of the Bill and Melinda Gates Foundation, to work towards development of green technologies. The other was the creation of the International Solar Alliance of countries blessed with abundant sunlight. The Headquarters of this alliance will be in Delhi, the Prime Minister said.
In this context, the Prime Minister appreciated the efforts of the Union Minister for Road Transport and Highways, Shri Nitin Gadkari, in the launch of this bus. The Prime Minister exhorted entrepreneurs to work towards producing cheap and efficient electric batteries in India, which could spur a drive towards clean public transportation.
Speaker of the Lok Sabha Smt. Sumitra Mahajan, Union Ministers Shri Nitin Gadkari, Shri Venkaiah Naidu, Shri Prakash Javadekar, and a large number of MPs were present on the occasion.
Cabinet approves three new corridors as part of Delhi Metro’s Phase V (A) Project
December 24, 2025
Share
The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi has approved three new corridors - 1. R.K Ashram Marg to Indraprastha (9.913 Kms), 2. Aerocity to IGD Airport T-1 (2.263 kms) 3. Tughlakabad to Kalindi Kunj (3.9 kms) as part of Delhi Metro’s Phase – V(A) project consisting of 16.076 kms which will further enhance connectivity within the national capital. Total project cost of Delhi Metro’s Phase – V(A) project is Rs.12014.91 crore, which will be sourced from Government of India, Government of Delhi, and international funding agencies.
The Central Vista corridor will provide connectivity to all the Kartavya Bhawans thereby providing door step connectivity to the office goers and visitors in this area. With this connectivity around 60,000 office goers and 2 lakh visitors will get benefitted on daily basis. These corridors will further reduce pollution and usage of fossil fuels enhancing ease of living.
Details:
The RK Ashram Marg – Indraprastha section will be an extension of the Botanical Garden-R.K. Ashram Marg corridor. It will provide Metro connectivity to the Central Vista area, which is currently under redevelopment. The Aerocity – IGD Airport Terminal 1 and Tughlakabad – Kalindi Kunj sections will be an extension of the Aerocity-Tughlakabad corridor and will boost connectivity of the airport with the southern parts of the national capital in areas such as Tughlakabad, Saket, Kalindi Kunj etc. These extensions will comprise of 13 stations. Out of these 10 stations will be underground and 03 stations will be elevated.
After completion, the corridor-1 namely R.K Ashram Marg to Indraprastha (9.913 Kms), will improve the connectivity of West, North and old Delhi with Central Delhi and the other two corridors namely Aerocity to IGD Airport T-1 (2.263 kms) and Tughlakabad to Kalindi Kunj (3.9 kms) corridors will connect south Delhi with the domestic Airport Terminal-1 via Saket, Chattarpur etc which will tremendously boost connectivity within National Capital.
These metro extensions of the Phase – V (A) project will expand the reach of Delhi Metro network in Central Delhi and Domestic Airport thereby further boosting the economy. These extensions of the Magenta Line and Golden Line will reduce congestion on the roads; thus, will help in reducing the pollution caused by motor vehicles.
The stations, which shall come up on the RK Ashram Marg - Indraprastha section are: R.K Ashram Marg, Shivaji Stadium, Central Secretariat, Kartavya Bhawan, India Gate, War Memorial - High Court, Baroda House, Bharat Mandapam, and Indraprastha.
The stations on the Tughlakabad – Kalindi Kunj section will be Sarita Vihar Depot, Madanpur Khadar, and Kalindi Kunj, while the Aerocity station will be connected further with the IGD T-1 station.
Construction of Phase-IV consisting of 111 km and 83 stations are underway, and as of today, about 80.43% of civil construction of Phase-IV (3 Priority) corridors has been completed. The Phase-IV (3 Priority) corridors are likely to be completed in stages by December 2026.
Today, the Delhi Metro caters to an average of 65 lakh passenger journeys per day. The maximum passenger journey recorded so far is 81.87 lakh on August 08, 2025. Delhi Metro has become the lifeline of the city by setting the epitome of excellence in the core parameters of MRTS, i.e. punctuality, reliability, and safety.
A total of 12 metro lines of about 395 km with 289 stations are being operated by DMRC in Delhi and NCR at present. Today, Delhi Metro has the largest Metro network in India and is also one of the largest Metros in the world.