PM announces ex-gratia from PMNRF

The Prime Minister has expressed deep sorrow over the tragic fire incident in Indore and has announced ex-gratia for the affected families.

Expressing deep pain over the loss of lives in the Indore fire mishap, the Prime Minister extended his heartfelt condolences to the bereaved families and prayed for the speedy recovery of those injured. Shri Modi further announced that an ex-gratia of Rs. 2 lakh from PMNRF would be given to the next of kin of each deceased, while the injured would be provided Rs. 50,000.

The Prime Minister wrote on X;

"Deeply pained by the loss of lives in a fire mishap in Indore, Madhya Pradesh. Condolences to those who have lost their loved ones. I pray for the speedy recovery of the injured.
An ex-gratia of Rs. 2 lakh from PMNRF would be given to the next of kin of each deceased. The injured would be given Rs. 50,000: PM" 

Explore More
প্রধান মন্ত্রীনা শ্রী রাম জন্মভুমি মন্দির দ্বাজরোহন উৎসবতা পীখিবা ৱারোলগী মৈতৈলোন্দা হন্দোকপা

Popular Speeches

প্রধান মন্ত্রীনা শ্রী রাম জন্মভুমি মন্দির দ্বাজরোহন উৎসবতা পীখিবা ৱারোলগী মৈতৈলোন্দা হন্দোকপা
India advances in clean energy race with Magnetoelectric Nano-Catalyst breakthrough

Media Coverage

India advances in clean energy race with Magnetoelectric Nano-Catalyst breakthrough
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves 4 lane construction from Barabanki to Bahraich in Uttar Pradesh worth Rs.6969.04 crore
March 18, 2026

The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved construction of 4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich (101.515 km) in Uttar Pradesh on Hybrid Annuity Mode (HAM) at a cost of Rs.6969.04 crore.

The proposed upgradation of the Barabanki–Bahraich section of NH-927 in Uttar Pradesh will address severe geometric deficiencies, sharp curves, and congestion in built-up areas across Barabanki and Bahraich district. Designed as an access-controlled 4-lane highway with continuous service roads, the project will bypass major habitations, increase average travel speeds, reduce travel time to about one hour, and improve overall road safety, fuel efficiency, and vehicle operating costs, thereby enhancing regional mobility and socio-economic development.

The project provides seamless connectivity to key economic, social, and logistics nodes across Uttar Pradesh. Additionally, the upgraded corridor will enhance multi-modal integration by connecting with 03 Economic Nodes, 02 Social Nodes and 12 Logistic Nodes, providing enhanced multimodality with Rupaidiha Land Port and Airports thereby facilitating faster movement of goods and passengers across the region. Upon completion, the project will strategically establish a vital cross-border trade and transit corridor between India and Nepal via the Nepalganj border, significantly improving access to the Rupaidiha Land Port. It will enhance connectivity to remote districts such as Bahraich district and Shravasti district, support PM GatiShakti economic and logistics nodes, and stimulate agri-trade, tourism, cross-border commerce, and regional investment.

Map of Corridor

Project Details:

Feature

Details

Project Name

4-Lane Access-Controlled National Highway-927 from Barabanki to Bahraich

Corridor

Lucknow – Rupaidiha

Length (km)

101.515

Total Civil Cost (Rs Cr.)

3485.49

Land Acquisition Cost (Rs Cr.)

1574.85

Total Capital Cost (Rs Cr.)

6969.04

Mode

Hybrid Annuity Mode (HAM)

Bypasses

48.28 km

Major Roads Connected

National Highways – NH-27, , NH-330B and NH-730

State Highways – SH-13 and SH-30B

Economic / Social / Transport Nodes Connected

Airports: Lucknow & Sharavasti

Railway Stations: Barabanki, Rasauli, Jangirabad, Rafinagar, Bindaura, Burhwal, Chowkaghat, Ghaghraghat, Jarwal and Bahraich

Land Port: Rupaidiha

Economic Nodes: 01 SEZ & 02 Mega Food Park

Social Nodes: 02 Aspirational Districts.

Major Cities / Towns Connected

Barabanki, Ramnagar, Jarwal, Kaisargan, Kundasar, Fakharpur and Bahraich

Employment Generation Potential

36.54 lakhs person-days (direct) & 43.04 lakh person-days (indirect)

Annual Average Daily Traffic (AADT) in FY-28

Estimated at 28,557 (Package-1) and 21,270 (Package-2) Passenger Car Units (PCU)