NITI Aayog will work with States to improve basic services and infrastructure in districts and regions which require specific attention
NITI Aayog partners with top ranking institutions to strengthen the learning ecosystem
NITI Aayog meet: Chief Ministers urged to expedite the enactment of State GST Acts

At the third meeting of the Governing Council, NITI Aayog, the CEO, NITI, Shri Amitabh Kant, apprised the gathering of the work done by Niti Aayog for transforming the economy and cooperation with States in the sectors of education, health, infrastructure etc. He spoke of the work done by the sub-groups of Chief Ministers on rationalisation of Centrally Sponsored Schemes, Swachh Bharat Mission and Skill Development. He outlined initiatives taken in areas such as agriculture, poverty elimination, health, education, digital payments, disinvestment, coastal zone and island development etc. He said that NITI will work with States to improve basic services and infrastructure, in districts and regions which require specific attention. He reiterated its resolve to facilitate partnership with States for transforming India under the framework of cooperative and competitive federalism. He requested the states to treat NITI as their outpost in Delhi.

NITI Aayog is working on a platform for sharing best practices to strengthen the learning ecosystem. It has partnered with large number of top ranking Institutions for knowledge sharing and ideation, to nurture evidence based policy making.

Vice Chairman, NITI Dr Arvind Panagariya set out the new approach which envisages a 15 year long term vision, accompanied by a 7 year strategy and a 3 year action agenda. He gave an outline of the draft Action Agenda circulated at the meeting, which had been prepared with inputs from the states. He noted that there were over 300 specific action points that had been identified, covering the whole gamut of sectors. The period of the Action Agenda coincided with the period of the 14th Finance Commission’s award. This gave stability to the funding estimates of both Centre and States. He solicited the inputs and support of the states in taking the vision forward.

Revenue Secretary Shri Hasmukh Adhia made a presentation on GST, explaining the benefits of the system and the way forward. He urged the Chief Ministers to expedite the enactment of State GST Acts.

Madhya Pradesh Chief Minister, Shri Shivraj Singh Chouhan, made a presentation on doubling of farmers’ income. He touched on areas such as irrigation, technology generation and dissemination, policy and market reforms, e-NAM, livestock productivity etc.

Member-Agriculture, NITI Aayog, Shri Ramesh Chand elaborated on some of the steps needed for doubling farmers’ income and spoke of the various elements of the Pradhan Mantri Krishi Sinchai Yojana, such as Accelerated Irrigation Benefits Programme, Har Khet Ko Pani, and Per Drop, More Crop.

Click here to read opening remarks at 3rd Meeting of Governing Council of NITI Aayog 

Click here to read closing remarks at 3rd Meeting of Governing Council of NITI Aayog

Explore More
شری رام جنم بھومی مندر دھوجاروہن اتسو کے دوران وزیر اعظم کی تقریر کا متن

Popular Speeches

شری رام جنم بھومی مندر دھوجاروہن اتسو کے دوران وزیر اعظم کی تقریر کا متن
'Best Never The Loudest': Bear Grylls Gives Shoutout To ‘Powerful Leader’ PM Modi

Media Coverage

'Best Never The Loudest': Bear Grylls Gives Shoutout To ‘Powerful Leader’ PM Modi
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves infrastructure projects between National Highway-19 and Varanasi Ring Road in Uttar Pradesh worth Rs.14447.64 crore
July 15, 2026

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the development of a Link/Connector Corridor between National Highway-19 (NH-19) and the Varanasi Ring Road with riverbank connectivity along the River Ganga for the decongestion of Varanasi City in Uttar Pradesh. The 46.039 km project, comprising a six-lane elevated main carriageway, an iconic cable-stayed bridge, an extradosed Foot Over Bridge-cum-Major Bridge, loops, ramps, link roads and service roads, will be implemented under the Hybrid Annuity Model (HAM) at a total capital cost of Rs.14,447.64 crore including a civil construction cost of Rs.6,037.85 crore (including utility shifting, excluding GST) and a land acquisition cost of Rs.541.11 crore under NH(O).

The project will provide seamless connectivity between NH-19 and the Varanasi Ring Road, significantly decongesting the city’s road network and improving urban mobility. Designed for an operating speed of 80–100 km/h, it is expected to reduce the average travel time across the project influence area from approximately 60 minutes to 20 minutes, representing a reduction of nearly 67 per cent. Travel time between NH-19 and Kashi Railway Station will be reduced from approximately 50 minutes to about 25 minutes, resulting in a saving of about 25 minutes (nearly 50 per cent).

Aligned with the PM Gati Shakti National Master Plan, the corridor will strengthen multimodal connectivity by providing seamless access to major highways, railway stations, Lal Bahadur Shastri Airport and Ramnagar IWAI Port, while significantly improving connectivity to key religious, educational and cultural landmarks, including the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the Ghats of Varanasi. By linking important economic, social and logistics nodes, the project will improve logistics efficiency, enhance road safety, facilitate tourism and pilgrimage, and support sustainable regional economic growth across eastern Uttar Pradesh.

The corridor has been conceived as a transformative urban mobility project to decongest the road network of Varanasi & Chandauli by providing a high-speed, access-controlled connection between NH-19, the Varanasi Ring Road (NH-135B), Ramnagar/ BHU and other major urban destinations. With more than 15 crore tourists and pilgrims visiting Varanasi every year, the project will significantly improve connectivity to major religious, educational and cultural landmarks, including the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort, the Ghats of Varanasi, and Kashi Railway Station, while substantially reducing congestion on the existing city road network. An elevated spur between BHU/Lanka and Samne Ghat will further ease traffic congestion at the heavily trafficked Lanka Junction by separating through traffic from local traffic movements.

The project will improve road safety through controlled-access movement, reduce vehicle operating costs and emissions, enhance travel reliability, and facilitate the efficient movement of passenger and freight traffic. It will also decongest NH-19, the BHU-Ramnagar Corridor and NH-35 by diverting through traffic away from the densely developed urban core.

The project incorporates several landmark engineering features, including an iconic 910 m cable-stayed bridge across the River Ganga, a 1.32 km extradosed Foot Over Bridge-cum-Major Bridge with travelators providing seamless pedestrian connectivity to the Kashi Vishwanath Temple, a Rail Over Bridge over the existing/proposed Malviya Bridge, dedicated emergency parking bays, noise barriers, façade lighting and architectural elements inspired by the cultural heritage of Varanasi. These features will not only improve transportation efficiency but also enhance the city’s urban landscape, create an iconic addition to Varanasi’s skyline, and reinforce its position as one of India’s foremost religious and cultural destinations.

Planned in accordance with the PM Gati Shakti National Master Plan, the corridor will strengthen multimodal connectivity by linking one Economic Node (Chandauli SEZ), one Social Node (Chandauli Aspirational District) and six major Logistics Nodes, namely Lal Bahadur Shastri Airport, Kashi Railway Station, Banaras Railway Station, Varanasi City Railway Station, Pt. Deen Dayal Upadhyay Junction and Ramnagar IWAI Port. By providing seamless connectivity between these transport hubs and key destinations such as the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the Ghats of Varanasi, the project will enhance multimodal integration, improve logistics efficiency, facilitate tourism and pilgrimage, and support sustainable regional economic development across eastern Uttar Pradesh.

Overall, the proposed Ganga Elevated Corridor will create a modern, high-capacity urban transport corridor that transforms mobility in Varanasi by providing faster, safer and more reliable connectivity, significantly reducing congestion, strengthening multimodal integration, enhancing tourism and pilgrimage infrastructure, and supporting sustainable economic growth in line with the vision of PM Gati Shakti and Viksit Bharat.

Map of Corridor: