PM to visit Gujarat on 10th June

Published By : Admin | June 8, 2022 | 19:23 IST
PM to inaugurate and lay foundation stone of multiple development projects worth Rs 3050 crores
Projects focussed on improving water supply in the region and enhancing ease of living
PM to inaugurate A.M. Naik Healthcare Complex and Nirali Multi Speciality Hospital in Navsari
PM to also inaugurate headquarters of IN-SPACe at Bopal, Ahmedabad

Prime Minister Shri Narendra Modi will visit Gujarat on 10th June. At around 10:15 AM, Prime Minister will inaugurate and lay the foundation stone of multiple development initiatives during ‘Gujarat Gaurav Abhiyan’ in Navsari. At around 12:15 PM, he will inaugurate A.M. Naik Healthcare Complex and Nirali Multi Speciality Hospital in Navsari. Thereafter, at around 3:45 PM, he will inaugurate the headquarters of Indian National Space Promotion and Authorisation Centre (IN-SPACe) at Bopal, Ahmedabad.

PM in Navsari

Prime Minister will participate in a programme named 'Gujarat Gaurav Abhiyan’. During the programme, he will inaugurate and lay the foundation stone of development initiatives worth about Rs 3050 crores at Khudvel, a tribal region in Navsari. This includes the inauguration of 7 projects, foundation stone laying for 12 projects and Bhumi Pujan of 14 projects. These projects will help in improving water supply in the region, along with boosting connectivity and enhancing ease of living.

Prime Minister will perform the Bhumi Pujan for 13 water supply projects for residents of Tapi, Navsari and Surat districts, worth ₹961 crores. He will also perform the Bhumi Pujan of a Medical College in Navsari district, to be built at the cost of about ₹542 crores, which will help provide affordable and quality medical care to the people of the region.

Prime Minister will inaugurate Madhuban dam based Astol regional water supply project, built at the cost of about ₹586 crores. It is a marvel of water supply engineering skills. Also, ‘Nal Se Jal’ projects worth ₹163 crores will be inaugurated by the Prime Minister. These projects will provide safe and adequate drinking water to the residents of Surat, Navsari, Valsad and Tapi districts.

Prime Minister will inaugurate Virpur Vyara substation, constructed at a cost of over ₹85 crores, to provide electricity to residents of Tapi district. A sewage treatment plant with a capacity of 14 MLD, worth ₹20 crores, will also be inaugurated for Vapi city of Valsad district to facilitate wastewater treatment. Prime Minister will inaugurate government quarters built in Navsari at a cost of over Rs 21 crores. He will also inaugurate roads constructed from Piplaidevi - Juner - Chichvihir - Pipaldahad and school buildings constructed in Dang, at a cost of about Rs 12 crore each.

Prime Minister will lay the foundation stone of 8 water supply projects worth ₹549 crores, to provide clean drinking water to the residents of Surat, Navsari, Valsad and Tapi districts. Foundation stone of a wide road connecting Khergam and Pipalkhed, to be built at the cost of ₹33 crores in Navsari district, will also be laid. Another four-lane road will be constructed between Navsari and Bardoli via Supa, at a cost of about ₹27 crores. Prime Minister will also lay the foundation stone for construction of Zila Panchayat Bhavan and for providing and fixing roller crash barrier in Dang at a cost of about Rs 28 crores and 10 crores respectively.

PM at A.M. Naik Healthcare Complex

Prime Minister will inaugurate A.M. Naik Healthcare Complex and Nirali Multi Speciality Hospital in Navsari. He will also attend a public function organised at the healthcare complex, where he will virtually inaugurate the Kharel education complex. This will be followed by his address on the occasion.

PM at IN-SPACe HQ

Prime Minister will inaugurate the headquarters of Indian National Space Promotion and Authorisation Centre (IN-SPACe) at Bopal, Ahmedabad. The programme will also witness exchange of MoUs between IN-SPACe and private sector companies working in the field of space based applications and services. The promotion and enabling of private entities in the space sector will provide a major fillip to the space sector and open up new vistas of opportunity for India’s talented youth.

The establishment of IN-SPACe was announced in June 2020. It is an autonomous and single window nodal agency in the Department of Space for promotion, encouragement and regulation of space activities of both government and private entities. It also facilitates the usage of ISRO facilities by private entities.

Explore More
శ్రీరామ జన్మభూమి ఆలయ ధ్వజారోహణ ఉత్సవం సందర్భంగా ప్రధానమంత్రి ప్రసంగం

ప్రముఖ ప్రసంగాలు

శ్రీరామ జన్మభూమి ఆలయ ధ్వజారోహణ ఉత్సవం సందర్భంగా ప్రధానమంత్రి ప్రసంగం
India records highest-ever startup surge with 55,200 recognised in FY26

Media Coverage

India records highest-ever startup surge with 55,200 recognised in FY26
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves two railway projects in Uttar Pradesh and Andhra Pradesh worth Rs 24,815 crore
April 18, 2026

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved 02 (Two) projects of Ministry of Railways with total cost of Rs. 24,815 crore (approx.). These projects include:

Name of Project

Route Length (in km)

Track Length (in km)

Completion Cost (Rs. in Cr.)

Ghaziabad – Sitapur 3rd and 4th Line

403

859

14,926

Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line

 

198

 

458

 

9,889

Total

601

1,317

24,815

The increased line capacity will significantly enhance mobility, resulting in improved operational efficiency and service reliability for Indian Railways. These multi-tracking proposals are poised to streamline operations and alleviate congestion. The projects are in line with the Prime Minister Shri Narendra Modiji’s Vision of a New India which will make people of the region “Atmanirbhar” by way of comprehensive development in the area which will enhance their employment/ self-employment opportunities.

The projects are planned on PM-Gati Shakti National Master Plan with focus on enhancing multi-modal connectivity & logistic efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for movement of people, goods, and services.

The 02 (Two) projects covering 15 Districts across the states of Uttar Pradesh and Andhra Pradesh will increase the existing network of Indian Railways by about 601 Kms.

The proposed capacity enhancement will improve rail connectivity to several prominent tourist destinations across the country, including Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), Naimisharanya (Sitapur), Annavaram, Antarvedi, Draksharamam, etc.

The proposed projects are essential routes for transportation of commodities such as coal, foodgrains, cement, POL, iron and steel, container, fertilizers, sugar, chemical salts, limestone, etc. The Railways being environment friendly and energy efficient mode of transportation, will help both in achieving climate goals and minimizing logistics cost of the country lowering CO2 emissions (180.31Crore Kg) which is equivalent to plantation of 7.33 Crore trees.

Ghaziabad – Sitapur 3rd and 4th Line (403 Km)

  • Ghaziabad – Sitapur is an existing double line section forming a key part of Delhi- Guwahati High Density Network (HDN 4).
  • The project is crucial for improving connectivity between the Northern and Eastern region of the country.
  • The existing line capacity utilization of the section is up to 168% and is projected to be up to 207% in case the project is not taken up.
  • Transverses through Ghaziabad, Hapur, Amroha, Moradabad, Rampur, Bareilly, Sahjahanpur, Lakhimpur Kheri and Sitapur districts of Uttar Pradesh.
  • The project route passes through major industrial centres - Ghaziabad (machinery, electronics, pharmaceuticals), Moradabad (brassware and handicrafts), Bareilly (furniture, textiles, engineering), Shahjahanpur (carpets and cement-related industries), and Roza (thermal power plant).
  • For seamless transportation, the project alignment is planned to bypass congested stations of Hapur, Simbhaoli, Moradabad, Rampur, Bareilly, Shahjahanpur, and Sitapur and accordingly, six new stations are proposed on the bypassing sections.
  • Key tourist/religious places along/near to the project section are Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), and Naimisharanya (Sitapur) among others.
  • Anticipated additional freight traffic of 35.72 MTPA consisting of Coal, Foodgrains, Chemical Manures, Finished Steel, etc.
  • Estimated Cost: Rs.14,926 crore (approx.)
  • Employment generation: 274 lakh human-days.
  • CO2 emissions saved: About 128.77 crore Kg CO2 equivalent to 5.15 Cr trees.

  • Logistic cost saving: Rs. 2,877.46 crore every year vis-a vis road transportation.

Ghaziabad – Sitapur 3rd and 4th Line (403 Km)

Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line (198 Km)

  • Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) section forms part of the Howrah – Chennai High Density Network (HDN).
  • The proposed project is part of quadrupling initiative of Howrah – Chennai High Density Network (HDN) route.
  • The project traverses through East Godavari, Konaseema, Kakinada, Anakapalle and Vishakapatnam districts of Andhra Pradesh.
  • Visakhapatnam is identified as an Aspirational District in the Aspirational Districts Programme.
  • It provides connectivity to major ports along the East Coast such as Visakhapatnam, Gangavaram, Machilipatnam and Kakinada.
  • The project route runs along the eastern coastline and is among the busiest, predominantly freight-oriented sections of the East Coast Rail Corridor.
  • The line capacity utilization of the section has already reached up to 130%, leading to frequent congestion and operational delays. The line capacity is expected to increase further due to proposed expansion of ports and industries in the region.
  • Project section includes 4.3 km rail bridge over Godavari River, 2.67 km viaduct, 3 bypasses and the new alignment is around 8 km shorter than the existing route, improving connectivity and operational efficiency.
  • The proposed section will also boost tourism by improving access to key destinations such as Annavaram, Antarvedi and Draksharamam etc.
  • Anticipated additional freight traffic of 29.04 MTPA consisting of Coal, Cement, Chemical Manures, Iron and Steel, Foodgrains, Containers, Bauxite, Gypsum, Limestone, etc.
  • Estimated Cost: Rs.9,889 crore (approx.)
  • Employment generation: 135 lakh human-days.
  • CO2 emissions saved: About 51.49 crore Kg CO2 equivalent to 2.06 Cr trees.

  • Logistic cost saving: Rs. 1,150.56 crore every year vis-a vis road transportation.

 

आर्थिक सशक्तिकरण:

Aspirational districts - Visakhapatnam district will get improved connectivity

Additional economic opportunities in the region through tourism & industries.

Better healthcare and education for the citizens due to enhanced rail connectivity.


Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line (198 Km)

Prime Minister’s focus on railways:

  • Record budget allocation of Rs. 2,65,000 crore for FY 26-27.
  • Manufacturing more than 1600 locomotives- surpassed US and Europe in manufacturing of locomotive production
  • In FY 26, Indian Railways is expected to rank among the top three freight carriers globally, moving 1.6 billion tonnes of cargo.

  • India starts exporting metro coaches to Australia and bogie to United Kingdom, Saudi Arabia, France and Australia.