শক্তমদা পি.এম. মোদীগী মে

Published By : Admin | May 31, 2025 | 08:07 IST

2025গী মে থা অসি পি.এম. মোদীগী দাইনামিক লীদরশিপ্না মার্ক তৌখ্রে, মসিদা ওপরেশন সিন্দুরগী মায় পাকপা অমসুং আদমপুর এয়রবেজগী মহাক্কী খোঙচৎতগী হৌরগা WAVES সমিৎ 2025 হৌদোকপা য়াওরি। CCSকুম্বা অৱাংবা থাক্কী মীফমশিং অমসুং পব্লিক ইন্তরেক্সনশিংনা থা অমগী মনুংদা জাতিগী চাউথোকচবা অমসুং চাউখৎ-থৌরাংগী ৱারেপশিং অদু ফোংদোক্লে।

Celebrated personalities from the film world and beyond join PM Modi at the WAVES 2025 in Mumbai!

PM Modi along with Air Chief Marshal Amar Preet Singh during the briefing of Operation Sindoor at the Adampur Air Base.

A glimpse into India’s creative future! PM Modi tours the exhibition at WAVES Summit 2025 in Mumbai.

PM Modi holds a key meeting with Raksha Mantri Rajnath Singh, NSA Ajit Doval, CDS Anil Chauhan and three chiefs of the armed forces at 7, LKM.

PM Modi chairs a high-level meeting on security at 7 LKM, New Delhi.

PM Modi receives a warm welcome in Thiruvananthapuram, Kerala.

PM Modi visits the exhibition at the inauguration of the WAVES 2025 in Mumbai, Maharashtra.

PM Modi and a child dive into the digital experience at the WAVES exhibition.

PM Modi and the President Joao Manuel Goncalves Lourenco of Angola during lunch at Hyderabad House in New Delhi.

PM Modi with the brave air warriors and soldiers at the Adampur Air Base.

PM Modi salutes the courage and dedication of the Indian Armed Forces during his visit to the Adampur Air Base.

PM Modi and Raksha Mantri Rajnath Singh during Cabinet meeting.

PM Modi receives a token of admiration from a student in Bikaner, Rajasthan.

PM Modi in conversation with Tamil Nadu CM, Thiru M. K. Stalin and Andhra Pradesh CM, N. Chandrababu Naidu Garu.

PM Modi shares a light-hearted moment with Chief Ministers of various states at the NITI Aayog Governing Council in New Delhi.

PM Modi engages in a light-hearted interaction with brave personnel during his visit to Adampur Air Base.

PM Modi arrives at the Adampur Air Base.

In a special moment, PM Modi interacts with a Divyangjan during a public event in Bhuj, Gujarat.

In a heartfelt moment, the Veeranganas of 1971 Indo-Pak war bless PM Modi at a public event in Bhuj.

PM Modi inside an electric locomotive at the Locomotive Manufacturing Plant in Dahod, Gujarat.

PM Modi visits the Locomotive Manufacturing Plant of the Indian Railways in Dahod, Gujarat.

The valiant women of 1971 Indo-Pak war present a ‘Sindoor’ sapling to PM Modi in Bhuj.

PM Modi leaves after NDA Chief Ministers’ Conclave in New Delhi.

With the Tiranga waving high, the crowd in Gandhinagar welcomes PM Modi with unmatched energy.

PM Modi warmly greets the crowd during a grand roadshow in Gandhinagar, Gujarat, as people line up waving the national flag.

PM Modi meets the young cricketing sensation Vaibhav Suryavanshi.

PM Modi hands over Ayushman and Vaya Vandana cards to the beneficiaries in Kanpur.

 

Explore More
প্রধান মন্ত্রীনা শ্রী রাম জন্মভুমি মন্দির দ্বাজরোহন উৎসবতা পীখিবা ৱারোলগী মৈতৈলোন্দা হন্দোকপা

Popular Speeches

প্রধান মন্ত্রীনা শ্রী রাম জন্মভুমি মন্দির দ্বাজরোহন উৎসবতা পীখিবা ৱারোলগী মৈতৈলোন্দা হন্দোকপা
India records highest-ever startup surge with 55,200 recognised in FY26

Media Coverage

India records highest-ever startup surge with 55,200 recognised in FY26
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves two railway projects in Uttar Pradesh and Andhra Pradesh worth Rs 24,815 crore
April 18, 2026

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved 02 (Two) projects of Ministry of Railways with total cost of Rs. 24,815 crore (approx.). These projects include:

Name of Project

Route Length (in km)

Track Length (in km)

Completion Cost (Rs. in Cr.)

Ghaziabad – Sitapur 3rd and 4th Line

403

859

14,926

Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line

 

198

 

458

 

9,889

Total

601

1,317

24,815

The increased line capacity will significantly enhance mobility, resulting in improved operational efficiency and service reliability for Indian Railways. These multi-tracking proposals are poised to streamline operations and alleviate congestion. The projects are in line with the Prime Minister Shri Narendra Modiji’s Vision of a New India which will make people of the region “Atmanirbhar” by way of comprehensive development in the area which will enhance their employment/ self-employment opportunities.

The projects are planned on PM-Gati Shakti National Master Plan with focus on enhancing multi-modal connectivity & logistic efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for movement of people, goods, and services.

The 02 (Two) projects covering 15 Districts across the states of Uttar Pradesh and Andhra Pradesh will increase the existing network of Indian Railways by about 601 Kms.

The proposed capacity enhancement will improve rail connectivity to several prominent tourist destinations across the country, including Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), Naimisharanya (Sitapur), Annavaram, Antarvedi, Draksharamam, etc.

The proposed projects are essential routes for transportation of commodities such as coal, foodgrains, cement, POL, iron and steel, container, fertilizers, sugar, chemical salts, limestone, etc. The Railways being environment friendly and energy efficient mode of transportation, will help both in achieving climate goals and minimizing logistics cost of the country lowering CO2 emissions (180.31Crore Kg) which is equivalent to plantation of 7.33 Crore trees.

Ghaziabad – Sitapur 3rd and 4th Line (403 Km)

  • Ghaziabad – Sitapur is an existing double line section forming a key part of Delhi- Guwahati High Density Network (HDN 4).
  • The project is crucial for improving connectivity between the Northern and Eastern region of the country.
  • The existing line capacity utilization of the section is up to 168% and is projected to be up to 207% in case the project is not taken up.
  • Transverses through Ghaziabad, Hapur, Amroha, Moradabad, Rampur, Bareilly, Sahjahanpur, Lakhimpur Kheri and Sitapur districts of Uttar Pradesh.
  • The project route passes through major industrial centres - Ghaziabad (machinery, electronics, pharmaceuticals), Moradabad (brassware and handicrafts), Bareilly (furniture, textiles, engineering), Shahjahanpur (carpets and cement-related industries), and Roza (thermal power plant).
  • For seamless transportation, the project alignment is planned to bypass congested stations of Hapur, Simbhaoli, Moradabad, Rampur, Bareilly, Shahjahanpur, and Sitapur and accordingly, six new stations are proposed on the bypassing sections.
  • Key tourist/religious places along/near to the project section are Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), and Naimisharanya (Sitapur) among others.
  • Anticipated additional freight traffic of 35.72 MTPA consisting of Coal, Foodgrains, Chemical Manures, Finished Steel, etc.
  • Estimated Cost: Rs.14,926 crore (approx.)
  • Employment generation: 274 lakh human-days.
  • CO2 emissions saved: About 128.77 crore Kg CO2 equivalent to 5.15 Cr trees.

  • Logistic cost saving: Rs. 2,877.46 crore every year vis-a vis road transportation.

Ghaziabad – Sitapur 3rd and 4th Line (403 Km)

Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line (198 Km)

  • Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) section forms part of the Howrah – Chennai High Density Network (HDN).
  • The proposed project is part of quadrupling initiative of Howrah – Chennai High Density Network (HDN) route.
  • The project traverses through East Godavari, Konaseema, Kakinada, Anakapalle and Vishakapatnam districts of Andhra Pradesh.
  • Visakhapatnam is identified as an Aspirational District in the Aspirational Districts Programme.
  • It provides connectivity to major ports along the East Coast such as Visakhapatnam, Gangavaram, Machilipatnam and Kakinada.
  • The project route runs along the eastern coastline and is among the busiest, predominantly freight-oriented sections of the East Coast Rail Corridor.
  • The line capacity utilization of the section has already reached up to 130%, leading to frequent congestion and operational delays. The line capacity is expected to increase further due to proposed expansion of ports and industries in the region.
  • Project section includes 4.3 km rail bridge over Godavari River, 2.67 km viaduct, 3 bypasses and the new alignment is around 8 km shorter than the existing route, improving connectivity and operational efficiency.
  • The proposed section will also boost tourism by improving access to key destinations such as Annavaram, Antarvedi and Draksharamam etc.
  • Anticipated additional freight traffic of 29.04 MTPA consisting of Coal, Cement, Chemical Manures, Iron and Steel, Foodgrains, Containers, Bauxite, Gypsum, Limestone, etc.
  • Estimated Cost: Rs.9,889 crore (approx.)
  • Employment generation: 135 lakh human-days.
  • CO2 emissions saved: About 51.49 crore Kg CO2 equivalent to 2.06 Cr trees.

  • Logistic cost saving: Rs. 1,150.56 crore every year vis-a vis road transportation.

 

आर्थिक सशक्तिकरण:

Aspirational districts - Visakhapatnam district will get improved connectivity

Additional economic opportunities in the region through tourism & industries.

Better healthcare and education for the citizens due to enhanced rail connectivity.


Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line (198 Km)

Prime Minister’s focus on railways:

  • Record budget allocation of Rs. 2,65,000 crore for FY 26-27.
  • Manufacturing more than 1600 locomotives- surpassed US and Europe in manufacturing of locomotive production
  • In FY 26, Indian Railways is expected to rank among the top three freight carriers globally, moving 1.6 billion tonnes of cargo.

  • India starts exporting metro coaches to Australia and bogie to United Kingdom, Saudi Arabia, France and Australia.