The Union Cabinet chaired by Prime Minister, Shri Narendra Modi has approved the Pune Metro Rail Project Phase-2: Vanaz to Chandani Chowk (Corridor 2A) and Ramwadi to Wagholi/Vitthalwadi (Corridor 2B), as extensions of the existing Vanaz–Ramwadi corridor under Phase-1. These two elevated corridors will span 12.75 km and include 13 stations, connecting fast-developing suburbs such as Chandani Chowk, Bavdhan, Kothrud, Kharadi, and Wagholi. The project is scheduled for completion within four years.

The estimated project cost is Rs.3626.24 crore, to be equally shared by the Government of India, Government of Maharashtra, and external bilateral/multilateral agencies. This strategic proposal is a logical extension of the existing Corridor-2 and aligns with the Comprehensive Mobility Plan (CMP), which envisions a continuous Chandani Chowk to Wagholi Metro corridor to strengthen East–West mass transit in Pune.

These extensions will serve key IT hubs, commercial areas, educational institutions, and residential pockets, increasing the share of public transport and ridership across the network. The new corridors will also integrate at the District Court Interchange Station with Line-1 (Nigdi–Katraj) and Line-3 (Hinjewadi–District Court) to enable seamless multimodal urban travel.

Under long-term mobility planning, intercity bus services from cities like Mumbai and Bengaluru will be integrated at Chandani Chowk, while those from Ahilya Nagar and Chhatrapati Sambhaji Nagar will connect at Wagholi, allowing passengers to easily access Pune’s Metro system. These extensions will also help decongest arterial routes such as Paud Road and Nagar Road, offering safe, fast, and eco-friendly mobility options.

After completion of these corridors, the projected incremental daily ridership for the entire Line 2 is estimated at 0.96 lakh in 2027, 2.01 lakh in 2037, 2.87 lakh in 2047, and 3.49 lakh in 2057. The project will be implemented by Maharashtra Metro Rail Corporation Limited (Maha-Metro), which will execute all civil, electro-mechanical, and related works. Pre-construction activities such as topographical survey and detailed design consultancy have already commenced.

This strategic expansion is poised to unlock Pune’s economic potential, enhance its urban transport infrastructure, and contribute significantly to sustainable and inclusive development across the metropolitan region.

Explore More
শ্রী রাম জন্মভূমি মন্দিরের ধ্বজারোহণ উৎসবে প্রধানমন্ত্রীর বক্তব্যের বাংলা অনুবাদ

জনপ্রিয় ভাষণ

শ্রী রাম জন্মভূমি মন্দিরের ধ্বজারোহণ উৎসবে প্রধানমন্ত্রীর বক্তব্যের বাংলা অনুবাদ
Project Cheetah: How A Species Declared Extinct During Nehru Era Returned To India Under Modi Govt

Media Coverage

Project Cheetah: How A Species Declared Extinct During Nehru Era Returned To India Under Modi Govt
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Prime Minister visits L&T complex at Hazira, Gujarat
June 05, 2026

Prime Minister Shri Narendra Modi today visited the Larsen & Toubro (L&T) complex at Hazira, Gujarat, where he witnessed pioneering innovations being developed by the company across various sectors.

The Prime Minister highly commended the significant role played by L&T in furthering self-reliance in India's defence sector. Sharing glimpses from the visit, Shri Modi appreciated the engineering achievements and advancements being spearheaded at the facility.

In a series of posts on X, the Prime Minister shared:

"This afternoon, went to the L&T complex at Hazira. Witnessed some of their pioneering innovations across different sectors. The role played by L&T in furthering self-reliance in the defence sector is commendable.
@larsentoubro"

"Here are some more glimpses from the visit to the L&T complex in Hazira, Gujarat."