IICC would reflect India’s economic progress, rich cultural heritage, and our consciousness towards environment protection: PM Modi
Our Government has begun a series of unprecedented projects for the nation’s development: PM Modi
Our Government does not shy away from taking tough decisions in national interest: PM Modi
All round progress has happened in the last four years only because national interest has been kept supreme: PM Modi

The Prime Minister, Shri Narendra Modi, today laid the foundation stone for India International Convention and Expo Centre (IICC) at Dwarka, New Delhi.

Speaking on the occasion, the Prime Minister said that this Centre would reflect India’s economic progress, rich cultural heritage, and our consciousness towards environment protection. He also said it is a part of the Government’s vision which gives importance to world class infrastructure, and ease of doing business.

The Prime Minister recounted how the Union Government has begun a series of unprecedented projects for the nation’s development. In this context, he mentioned the longest tunnel, the longest gas pipeline, the largest mobile manufacturing unit, and electricity to every household among many others. He said these are illustrations of the skill, scale and speed of New India.

The Prime Minister said that several countries across the world have developed elaborate capacities to hold conferences. He said this had not been thought of in India for a quite a while. Now this is changing, he added.

The Prime Minister said that a country progresses through strong organizational and institutional capacities, which are the result of years of effort. He said that for this, it is important to take decisions at the right time, and implement them without delay.

In this context, the Prime Minister mentioned the recent decision on merger of Public Sector Banks. He said this had been thought about for nearly two and a half decades, but not implemented. However, he asserted that this Government does not shy away from taking tough decisions in national interest. He said that all round progress has happened in the last four years only because national interest has been kept supreme. He asserted that this process of taking tough decisions in the best interest of the people, will continue. He said that despite challenges, the economy is on a firm footing. Mentioning “ease of doing business”, he said the Government is now working towards taking this effort to the district level as well.

Click here to read PM's speech 

Explore More
শ্ৰী ৰাম জনমভূমি মন্দিৰৰ ধ্বজাৰোহণ উৎসৱত প্ৰধানমন্ত্ৰীৰ সম্বোধনৰ অসমীয়া অনুবাদ

Popular Speeches

শ্ৰী ৰাম জনমভূমি মন্দিৰৰ ধ্বজাৰোহণ উৎসৱত প্ৰধানমন্ত্ৰীৰ সম্বোধনৰ অসমীয়া অনুবাদ
India's manufacturing outlook remains resilient despite global headwinds; machine tools, metals and auto lead optimism

Media Coverage

India's manufacturing outlook remains resilient despite global headwinds; machine tools, metals and auto lead optimism
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves a Road Construction project in Uttar Pradesh worth Rs.7145.14 crore
July 01, 2026

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the construction of 117.7 km Kanpur–Kabrai Access-Controlled Greenfield Highway, a four-lane access-controlled corridor with structures designed for future six-laning, forming a key segment of the Bhopal–Kanpur Economic Corridor under the National Highways (O) Programme. With an estimated total capital cost of Rs.7145.14 crore, the project will be implemented by the National Highways Authority of India (NHAI) on BOT (Toll) mode, together with the operation and maintenance of the existing Kanpur-Kabrai section of NH-34.

The project will provide seamless, high-speed connectivity between Kanpur and Kabrai, while strengthening onward connectivity to Sagar, Bhopal and other parts of Madhya Pradesh, thereby creating a modern access controlled economic corridor linking the industrial and commercial centres of Uttar Pradesh with mineral-rich, manufacturing and agricultural regions of Madhya Pradesh thereby improving.

Designed for operating speeds of 80–100 kmph, the corridor will reduce travel time between Kanpur and Kabrai from 3.5 hours to 1.5 hours (58%), while improving road safety, reducing vehicle operating costs and facilitating efficient movement of passenger and freight traffic. The project will also provide strategic connectivity with NH-34, NH-35, the Bundelkhand Expressway, Kanpur Ring Road, and State Highways SH-46, SH-91, SH-10B and SH-42, thereby strengthening integration with the regional highway network. The corridor further strengthen connectivity to the Kabrai mining belt, improving the movement of minerals, industrial goods, construction materials and agricultural produce, thereby enhancing logistics efficiency, supply chain resilience and regional economic development.

Aligned with the PM GatiShakti National Master Plan, the project will improve connectivity to 16 Economic Nodes, including the Unnao, Banther, Pankhi, Rania, Jainpur, Rooma, Chakeri, Sumerpur and Bhuragarh Industrial Areas, Trans Ganga Integrated Township, Growth Centre Jaipur, Kanpur Nagar Node and Bengal Chemicals & Pharmaceuticals Ltd. It will also strengthen connectivity to 9 Social Nodes, namely Fatehpur, Mahoba, Kanpur Zoological Park, Buddha Park, J.K. Temple & Garden, Radha Krishna Temple, Siddheshwar Mahadev Temple, Gopeshwar Mandir and Mahoba Tourist Place, and 10 Logistics Nodes, including Kanpur, Ghatampur, Hamirpur, Mahoba, Kabrai, Bharwa Sumerpur and Banda Railway Stations, together with Kanpur, Chakeri and Khajuraho Airports.

Overall, improve logistics competitiveness, industrial development and economic growth across Bundelkhand and adjoining regions of Uttar Pradesh and Madhya Pradesh, while advancing the objectives of PM GatiShakti.

The project is expected to generate approximately 11,188 direct and 13,985 indirect person-days of employment per lane per km during construction and is projected to carry an Annual Average Daily Traffic (AADT) of about 18,069 Passenger Car Units (PCUs) by FY 2028, underscoring its long-term economic, logistics and transport significance. The proposed project will thus generate close to 1.2 Crore person-days of direct employment and indirect employment.

Map of Corridor: