Published By : Admin |
December 30, 2023 | 16:50 IST
Share
Facade of the terminal building depicts the temple architecture of the upcoming Shri Ram Mandir
The Prime Minister, Shri Narendra Modi today inaugurated the newly built Ayodhya Airport. The airport has been named Maharishi Valmiki International Airport.
Later, speaking at a public event, the Prime Minister expressed happiness on naming Ayodhya Airport after Maharishi Valmiki. He said Maharishi Valmiki’s Ramayana is the path of knowledge which connects us to Shri Ram. Maharishi Valmiki International Airport in modern India will connect us to Ayodhya Dham and the divine-grand-new Ram temple. In the first phase the airport can handle 10 lakh passengers annually and after the second phase, Maharishi Valmiki International Airport will cater to 60 lakh commuters annually.
Phase 1 of the state-of-the-art airport is developed at a cost of more than Rs 1450 crore. The airport’s terminal building will have an area of 6500 sqm, equipped to serve about 10 lakh passengers annually. The facade of the Terminal Building depicts the temple architecture of the upcoming Shri Ram Mandir of Ayodhya. The interiors of the terminal Building are decorated with local art, paintings & murals depicting the life of Bhagwan Shri Ram. The terminal building of Ayodhya airport is also equipped with various sustainability features like insulated roofing system, LED lighting, rain water harvesting, landscaping with fountains, water treatment plant, sewage treatment plant, solar power plant and many other such features have been provided to meet GRIHA - 5 star ratings. The airport will improve connectivity in the region, leading to a boost in tourism, business activities and employment opportunities.
Cabinet approves three new corridors as part of Delhi Metro’s Phase V (A) Project
December 24, 2025
Share
The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi has approved three new corridors - 1. R.K Ashram Marg to Indraprastha (9.913 Kms), 2. Aerocity to IGD Airport T-1 (2.263 kms) 3. Tughlakabad to Kalindi Kunj (3.9 kms) as part of Delhi Metro’s Phase – V(A) project consisting of 16.076 kms which will further enhance connectivity within the national capital. Total project cost of Delhi Metro’s Phase – V(A) project is Rs.12014.91 crore, which will be sourced from Government of India, Government of Delhi, and international funding agencies.
The Central Vista corridor will provide connectivity to all the Kartavya Bhawans thereby providing door step connectivity to the office goers and visitors in this area. With this connectivity around 60,000 office goers and 2 lakh visitors will get benefitted on daily basis. These corridors will further reduce pollution and usage of fossil fuels enhancing ease of living.
Details:
The RK Ashram Marg – Indraprastha section will be an extension of the Botanical Garden-R.K. Ashram Marg corridor. It will provide Metro connectivity to the Central Vista area, which is currently under redevelopment. The Aerocity – IGD Airport Terminal 1 and Tughlakabad – Kalindi Kunj sections will be an extension of the Aerocity-Tughlakabad corridor and will boost connectivity of the airport with the southern parts of the national capital in areas such as Tughlakabad, Saket, Kalindi Kunj etc. These extensions will comprise of 13 stations. Out of these 10 stations will be underground and 03 stations will be elevated.
After completion, the corridor-1 namely R.K Ashram Marg to Indraprastha (9.913 Kms), will improve the connectivity of West, North and old Delhi with Central Delhi and the other two corridors namely Aerocity to IGD Airport T-1 (2.263 kms) and Tughlakabad to Kalindi Kunj (3.9 kms) corridors will connect south Delhi with the domestic Airport Terminal-1 via Saket, Chattarpur etc which will tremendously boost connectivity within National Capital.
These metro extensions of the Phase – V (A) project will expand the reach of Delhi Metro network in Central Delhi and Domestic Airport thereby further boosting the economy. These extensions of the Magenta Line and Golden Line will reduce congestion on the roads; thus, will help in reducing the pollution caused by motor vehicles.
The stations, which shall come up on the RK Ashram Marg - Indraprastha section are: R.K Ashram Marg, Shivaji Stadium, Central Secretariat, Kartavya Bhawan, India Gate, War Memorial - High Court, Baroda House, Bharat Mandapam, and Indraprastha.
The stations on the Tughlakabad – Kalindi Kunj section will be Sarita Vihar Depot, Madanpur Khadar, and Kalindi Kunj, while the Aerocity station will be connected further with the IGD T-1 station.
Construction of Phase-IV consisting of 111 km and 83 stations are underway, and as of today, about 80.43% of civil construction of Phase-IV (3 Priority) corridors has been completed. The Phase-IV (3 Priority) corridors are likely to be completed in stages by December 2026.
Today, the Delhi Metro caters to an average of 65 lakh passenger journeys per day. The maximum passenger journey recorded so far is 81.87 lakh on August 08, 2025. Delhi Metro has become the lifeline of the city by setting the epitome of excellence in the core parameters of MRTS, i.e. punctuality, reliability, and safety.
A total of 12 metro lines of about 395 km with 289 stations are being operated by DMRC in Delhi and NCR at present. Today, Delhi Metro has the largest Metro network in India and is also one of the largest Metros in the world.