IPS Probationers of 2017 batch call on PM

Published By : Admin | October 8, 2018 | 15:14 IST

About 100 Probationers of the 2017 batch of the Indian Police Service, today called on Prime Minister Narendra Modi.

|

Interacting with the Probationers, the Prime Minister emphasized the importance of working with dedication, to perform with distinction, the various roles and responsibilities that they would be looking after.

|

The Prime Minister recalled the sacrifices of over 33,000 police personnel, who have laid down their lives, while performing their duty.

|

Subjects such as good governance, discipline and conduct, women empowerment, and forensic science, also came up for discussion.

  • Reena chaurasia August 29, 2024

    बीजेपी
Explore More
Blood of every Indian is on the boil: PM Modi in Mann Ki Baat

Popular Speeches

Blood of every Indian is on the boil: PM Modi in Mann Ki Baat
After Sindoor, the writing is on the wall for Pakistan

Media Coverage

After Sindoor, the writing is on the wall for Pakistan
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves construction of 4-Lane Badvel-Nellore Corridor in Andhra Pradesh
May 28, 2025
QuoteTotal capital cost is Rs.3653.10 crore for a total length of 108.134 km

The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved the construction of 4-Lane Badvel-Nellore Corridor with a length of 108.134 km at a cost of Rs.3653.10 crore in state of Andhra Pradesh on NH(67) on Design-Build-Finance-Operate-Transfer (DBFOT) Mode.

The approved Badvel-Nellore corridor will provide connectivity to important nodes in the three Industrial Corridors of Andhra Pradesh, i.e., Kopparthy Node on the Vishakhapatnam-Chennai Industrial Corridor (VCIC), Orvakal Node on Hyderabad-Bengaluru Industrial Corridor (HBIC) and Krishnapatnam Node on Chennai-Bengaluru Industrial Corridor (CBIC). This will have a positive impact on the Logistic Performance Index (LPI) of the country.

Badvel Nellore Corridor starts from Gopavaram Village on the existing National Highway NH-67 in the YSR Kadapa District and terminates at the Krishnapatnam Port Junction on NH-16 (Chennai-Kolkata) in SPSR Nellore District of Andhra Pradesh and will also provide strategic connectivity to the Krishnapatnam Port which has been identified as a priority node under Chennai-Bengaluru Industrial Corridor (CBIC).

The proposed corridor will reduce the travel distance to Krishanpatnam port by 33.9 km from 142 km to 108.13 km as compared to the existing Badvel-Nellore road. This will reduce the travel time by one hour and ensure that substantial gain is achieved in terms of reduced fuel consumption thereby reducing carbon foot print and Vehicle Operating Cost (VOC). The details of project alignment and Index Map is enclosed as Annexure-I.

The project with 108.134 km will generate about 20 lakh man-days of direct employment and 23 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor.

Annexure-I

 

 The details of Project Alignment and Index Map:

|

 Figure 1: Index Map of Proposed Corridor

|

 Figure 2: Detailed Project Alignment