The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the construction of the Central Government General Pool Office Accommodation (CGGPOA) at the New Capital City, Amaravati, Andhra Pradesh.

This project is a landmark initiative in the new Greenfield city of Amaravati, envisioned to evolve into a world-class urban centre. The objective of the proposal is to address the growing demand for office accommodation for various Central Government offices by housing them under one roof. This consolidation will enhance inter-departmental coordination and improve the efficiency and effectiveness of services delivered by the Central Government to the State of Andhra Pradesh.

The Central Government General Pool Office Accommodation (CGGPOA) at New Capital City, Amaravati, Andhra Pradesh, is planned over an area of 5.53 acres. The CGGPOA comprises two blocks: one block on Plot C-9 with Ground + 13 floors (Ground Floor for services, three floors for podium parking, and ten floors for office spaces), and another block on Plot C-8 with Ground + 10 floors (Ground Floor for services, three floors for podium parking, and seven floors for office spaces). The facility is designed to accommodate approximately 8,000 officials and staff members. Podium parking provision for about 1,800 Equivalent Car Spaces (ECS) is proposed. The total built-up area of the project is 23,25,000 sqft. (2,16,032 sqm.).

Across the globe, there is a growing emphasis on environmentally sustainable and resource-efficient construction practices. Reflecting this commitment, the proposed Central Government General Pool Office Accommodation (CGGPOA) at New Capital City, Amaravati, Andhra Pradesh, is being planned and designed in accordance with the highest green building standards prevalent in India. The project aims to minimize environmental impact through sustainable site planning, enhanced energy efficiency, water conservation, usage of locally available materials, and improved occupant health and comfort. The campus will be designed, constructed, and registered to achieve a minimum GRIHA 4-Star Rating and will comply with the latest provisions of the Energy Conservation and Sustainable Building Code (ECSBC) 2024.

The Central Government General Pool Office Accommodation (CGGPOA) at New Capital City, Amaravati, Andhra Pradesh, will be equipped with essential civic and community amenities, including a Bank with ATM, Post Office, Crèche, Recreation Room, Ladies’ Room, Conference Hall with a seating capacity of 100, Multipurpose Hall with a seating capacity of 500, and four canteens to cater to the needs of employees and visitors.

The campus will incorporate a barrier-free built environment to ensure accessibility, safety, and convenience for Divyangjan (Persons with Disabilities), in compliance with applicable accessibility norms and standards.

The project is expected to generate substantial direct and indirect employment opportunities for skilled, semi-skilled, and unskilled workers. During the construction phase, employment generation is estimated at approximately 7,00,000 man-days per annum, while the operational phase is expected to generate around 50,000 man-days per annum.

PROJECT COST & FUNDING

The estimated cost of the project is ₹1,299.08 crores, which will be funded by the Government of India through budgetary support under the Head of Account: 4059 Capital Outlay on Public Works).

PRE-PROJECT ACTIVITIES

The project will be executed by the Ministry of Housing & Urban Affairs through the Central Public Works Department (CPWD). Pre-bid activities have already commenced, and the preparation of tender documents is presently in progress.

PROPOSED CENTRAL GOVERNMENT GENERAL POOL OFFICE ACCOMMODATION (CGGPOA) AT NEW CAPITAL CITY, AMARAVATI, ANDHRA PRADESH

 

Explore More
Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya

Popular Speeches

Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya
West Bengal Joins Ayushman Bharat PM-JAY, Becomes 36th State/UT To Implement Scheme

Media Coverage

West Bengal Joins Ayushman Bharat PM-JAY, Becomes 36th State/UT To Implement Scheme
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves Ahmedabad Metro Rail project Phase 2A (Koteshwar Road to Airport corridor)
June 10, 2026

The Union Cabinet chaired by the Prime Minister Shri Narendra Modi has approved Phase 2(A) of Ahmedabad Metro Rail Project with corridor for a length of 6.032 Km with 05 stations (04 Elevated and 01 underground). On operationalisation of Phase 2(A), Ahmedabad-Gandhinagar will have 77.63 Km of active Metro Rail Network. The names of stations in the Phase 2(A) Corridor are- Ashram Road, Koteshwar Prachin Mandir, Sabarmati River, Sardar Nagar and Airport.

The total completion cost including IDC (Interest during Construction) for the project will be Rs.2,169.04 crore.

Benefits and Bolstering Growth:

The Phase 2(A) of Ahmedabad Metro Rail Project represents a significant advancement in the city’s infrastructure development. Phase 2(A) acts as a major expansion of the Metro Rail Network in the city.

Enhanced Connectivity:

Phase 2(A) of the Ahmedabad Metro Project envisages the development of approximately 6.032 km of new metro corridor, aimed at substantially enhancing public transportation by providing seamless connectivity to the airport and linking key residential and commercial areas that presently lack efficient transit access.

This phase aims to seamlessly integrate key zones, including residential & Commercial hubs with existing Ahmedabad-Gandhinagar corridor. Further, likelihood of sports facilities also being developed in the vicinity for the World Police Games 2029 and Commonwealth Games 2030.

By bridging these vital areas with the metro network, Phase 2(A) will not only enhance connectivity but also stimulate economic activity, tourism, and ease urban mobility for both residents and visitors.

Reduction in Traffic Congestion: Metro Rail as an efficient alternate road transport and with Phase 2(A) as an extension of the Metro Rail network to the Airport, will be particularly impactful inside Ahmedabad. Reduction in road traffic can lead to smoother movement of vehicles, reduction in travel time, increasing overall road safety etc.

Environmental Benefits: With the addition of Phase 2(A) of Ahmedabad Metro Rail Project and increase in overall Metro Rail Network in Ahmedabad & Gandhinagar cities, can significantly reduce carbon emissions compared to traditional fossil fuel-based transport.

Economic Growth: Reduced travel times and improved access to different parts of the city such as Airport, Railway Stations and Bus Depots can enhance productivity by allowing individuals to reach their workplaces and destinations more efficiently. Also, the enhanced connectivity can stimulate local businesses, especially in areas near new metro stations which can also attract investment and development in previously less accessible regions.

Social Impact: The expansion of Phase 2(A) Metro Rail network in Ahmedabad will provide more equitable access to public transport, benefiting diverse socio-economic groups and reducing transport disparities which will contribute to a higher quality of life by reducing commute times and improving access to essential services.
The Phase 2(A) of Ahmedabad Metro Rail Project is set to be a transformative development for the city. It promises to deliver enhanced connectivity, reduced traffic congestion, environmental benefits, economic growth, and improved quality of life. By addressing key urban challenges and providing a foundation for future expansion, Phase 2(A) will play a crucial role in shaping the city's development trajectory and sustainability.

The Ahmedabad Metro Phase 2A will generate employment of around 2,000 persons during the peak period of construction activity and 500 persons are likely to work during Operation & Maintenance of the system.

Route Map: