PM meets Brazilian President Dilma Rousseff in Brasilia

Published By : Admin | July 16, 2014 | 21:53 IST
"Both leaders call for expanding bilateral ties, and stress on the need for reform of the United Nations 3 MoUs signed"

Brazilian President Dilma Rousseff hosted Prime Minister Narendra Modi in Brasilia on the margins of the Sixth BRICS Summit. Although it is not a bilateral visit, President Rousseff, in a special gesture, received Prime Minister of India with full military honours at the Presidential palace before their meeting over breakfast.

l2014071655193 _ 684

Prime Minister warmly congratulated President Rousseff and the people of Brazil for an excellent FIFA world cup, which showed the World Brazil`s excellent organizational skills and warm hospitality. He thanked President Rousseff for a well organized and successful BRICS summit, and in particular, arranging a meeting for BRICS with South American leaders.

Shri Narendra Modi described the sixth summit hosted by Brazil as a historic one, which has produced two important agreements - the New Development Bank and the BRICS Contingent Reserve Arrangement - and lauded President Rousseff for her guidance during the Summit.

Describing Brazil as a key global partner for India, Prime Minister noted that as two democracies and major emerging economies, India and Brazil not only had vast potential for bilateral cooperation, but also to strengthen each other in international forums and advance the interest of the developing world at large. He also noted that Gujarat has emerged as a prime driver of India`s economic relations with Brazil.

l2014071655194 _ 684

President Rousseff emphasized the special place this relationship enjoyed in Brazil`s foreign policy, because of the potential for bilateral cooperation and the international significance of their partnership. She congratulated Shri Narendra Modi for his impressive victory in the elections and wished him all success for India`s progress and development.

The two leaders recalled the historical and cultural ties between the two countries, despite the distance, including the Gir cows that were brought to Brazil from India, the textiles and the fruits that came from India to Brazil since 18th and 19th centuries.

The two leaders also agreed to take steps to further expand and diversify trade and investment flows and deepen cooperation in agriculture and dairy science, conventional and renewable energy, space research and applications, defence, cyber security and environment conservation. They also agreed to intensify their cooperation in international forums and multilateral institutions, including the G20. As leaders of G4 countries, Prime Minister Shri Narendra Modi, and President Rousseff called for urgent progress on reforms of the United Nations, including the Security Council, by the time of the seventieth anniversary of the UN in 2015.

Prime Minister expressed hope that he would be able to visit Brazil on a full bilateral visit soon and invited President Rousseff to visit India.

Following their meeting, the two sides signed three agreements:

-MoU on cooperation in the field of environment

-Implementing arrangement establishing cooperation in augmentation of a Brazilian earth station for receiving and processing data from Indian Remote Sensing (IRS) Satellites

-MoU on cooperation in the field of mobility and consular issues.

Explore More
শ্ৰী ৰাম জনমভূমি মন্দিৰৰ ধ্বজাৰোহণ উৎসৱত প্ৰধানমন্ত্ৰীৰ সম্বোধনৰ অসমীয়া অনুবাদ

Popular Speeches

শ্ৰী ৰাম জনমভূমি মন্দিৰৰ ধ্বজাৰোহণ উৎসৱত প্ৰধানমন্ত্ৰীৰ সম্বোধনৰ অসমীয়া অনুবাদ
Regional languages take precedence in Lok Sabha addresses

Media Coverage

Regional languages take precedence in Lok Sabha addresses
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves three new corridors as part of Delhi Metro’s Phase V (A) Project
December 24, 2025

The Union Cabinet chaired by the Prime Minister, Shri Narendra Modi has approved three new corridors - 1. R.K Ashram Marg to Indraprastha (9.913 Kms), 2. Aerocity to IGD Airport T-1 (2.263 kms) 3. Tughlakabad to Kalindi Kunj (3.9 kms) as part of Delhi Metro’s Phase – V(A) project consisting of 16.076 kms which will further enhance connectivity within the national capital. Total project cost of Delhi Metro’s Phase – V(A) project is Rs.12014.91 crore, which will be sourced from Government of India, Government of Delhi, and international funding agencies.

The Central Vista corridor will provide connectivity to all the Kartavya Bhawans thereby providing door step connectivity to the office goers and visitors in this area. With this connectivity around 60,000 office goers and 2 lakh visitors will get benefitted on daily basis. These corridors will further reduce pollution and usage of fossil fuels enhancing ease of living.

Details:

The RK Ashram Marg – Indraprastha section will be an extension of the Botanical Garden-R.K. Ashram Marg corridor. It will provide Metro connectivity to the Central Vista area, which is currently under redevelopment. The Aerocity – IGD Airport Terminal 1 and Tughlakabad – Kalindi Kunj sections will be an extension of the Aerocity-Tughlakabad corridor and will boost connectivity of the airport with the southern parts of the national capital in areas such as Tughlakabad, Saket, Kalindi Kunj etc. These extensions will comprise of 13 stations. Out of these 10 stations will be underground and 03 stations will be elevated.

After completion, the corridor-1 namely R.K Ashram Marg to Indraprastha (9.913 Kms), will improve the connectivity of West, North and old Delhi with Central Delhi and the other two corridors namely Aerocity to IGD Airport T-1 (2.263 kms) and Tughlakabad to Kalindi Kunj (3.9 kms) corridors will connect south Delhi with the domestic Airport Terminal-1 via Saket, Chattarpur etc which will tremendously boost connectivity within National Capital.

These metro extensions of the Phase – V (A) project will expand the reach of Delhi Metro network in Central Delhi and Domestic Airport thereby further boosting the economy. These extensions of the Magenta Line and Golden Line will reduce congestion on the roads; thus, will help in reducing the pollution caused by motor vehicles.

The stations, which shall come up on the RK Ashram Marg - Indraprastha section are: R.K Ashram Marg, Shivaji Stadium, Central Secretariat, Kartavya Bhawan, India Gate, War Memorial - High Court, Baroda House, Bharat Mandapam, and Indraprastha.

The stations on the Tughlakabad – Kalindi Kunj section will be Sarita Vihar Depot, Madanpur Khadar, and Kalindi Kunj, while the Aerocity station will be connected further with the IGD T-1 station.

Construction of Phase-IV consisting of 111 km and 83 stations are underway, and as of today, about 80.43% of civil construction of Phase-IV (3 Priority) corridors has been completed. The Phase-IV (3 Priority) corridors are likely to be completed in stages by December 2026.

Today, the Delhi Metro caters to an average of 65 lakh passenger journeys per day. The maximum passenger journey recorded so far is 81.87 lakh on August 08, 2025. Delhi Metro has become the lifeline of the city by setting the epitome of excellence in the core parameters of MRTS, i.e. punctuality, reliability, and safety.

A total of 12 metro lines of about 395 km with 289 stations are being operated by DMRC in Delhi and NCR at present. Today, Delhi Metro has the largest Metro network in India and is also one of the largest Metros in the world.