The Cabinet Committee on Economic Affairs (CCEA), chaired by the Prime Minister Shri Narendra Modi, has approved the construction of 4-lane access controlled greenfield and brownfield Patna – Arrah – Sasaram corridor starting from Patna to Sasaram (120.10 km) in Bihar. The project will be developed on Hybrid Annuity Mode (HAM) at a total capital cost of Rs. 3,712.40 crore.

Currently, connectivity between Sasaram, Arrah and Patna relies on existing State Highways (SH-2, SH-12, SH-81 and SH-102) and takes 3-4 hours due to heavy congestion including in Arrah town. A greenfield corridor, along with 10.6 km of upgradation of existing brownfield highway, will be developed to reduce the increasing congestion, catering to the needs of densely built-up areas in places like Arrah, Grahini, Piro, Bikramganj, Mokar and Sasaram.

The project alignment integrates with major transport corridors, including NH-19, NH-319, NH-922, NH-131G, and NH-120, providing seamless connectivity to Aurangabad, Kaimur, and Patna. Additionally, the project will also provide connectivity to 02 airports (Patna’s Jay Prakash Narayan International Airport and upcoming Bihita airport), 04 major railway stations (Sasaram, Arrah, Danapur, Patna), and 01 Inland Water Terminal (Patna), and enhance direct access to Patna Ring Road, facilitating faster movement of goods and passengers.

Upon completion, the Patna-Arrah-Sasaram Corridor will play a pivotal role in regional economic growth, improving connectivity between Lucknow, Patna, Ranchi, and Varanasi. The project aligns with the government’s vision of Atmanirbhar Bharat, enhancing infrastructure while generating employment and fostering socio-economic development in Bihar. The project will also generate 48 lakh man days employment, and will open new avenues of growth, development and prosperity in developing regions in and around Patna.

Map of Corridor

Project Details:

Feature

Details

Project Name

4-Lane Greenfield & Brownfield Patna-Arrah-Sasaram Corridor

Corridor

Patna-Arrah-Sasaram (NH-119A)

Length (km)

120.10

Total Civil Cost (Rs. in Cr.)

2,989.08

Land Acquisition Cost (Rs. in Cr.)

718.97

Total Capital Cost (Rs. in Cr.)

3,712.40

Mode

Hybrid Annuity Mode (HAM)

Major Roads Connected

National Highways - NH-19, NH-319, NH-922, NH-131G, NH-120

State Highways - SH-2, SH-81, SH-12, SH-102

Economic / Social / Transport Nodes Connected

Airports: Jay Prakash Narayan International Airport (Patna), Bihita Airport (upcoming)

Railway Stations: Sasaram, Arrah, Danapur, Patna

Inland Water Terminal: Patna

Major Cities / Towns Connected

Patna, Arrah, Sasaram

Employment Generation Potential

22 lakh person-days (direct) & 26 lakh person-days (indirect)

Annual Average Daily Traffic (AADT) in FY-25

Estimated at 17,000-20,000 Passenger Car Units (PCUs)

Explore More
শ্ৰী ৰাম জনমভূমি মন্দিৰৰ ধ্বজাৰোহণ উৎসৱত প্ৰধানমন্ত্ৰীৰ সম্বোধনৰ অসমীয়া অনুবাদ

Popular Speeches

শ্ৰী ৰাম জনমভূমি মন্দিৰৰ ধ্বজাৰোহণ উৎসৱত প্ৰধানমন্ত্ৰীৰ সম্বোধনৰ অসমীয়া অনুবাদ
Jan Dhan accounts hold Rs 2.75 lakh crore in banks: Official

Media Coverage

Jan Dhan accounts hold Rs 2.75 lakh crore in banks: Official
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Prime Minister condoles loss of lives due to a mishap in Nashik, Maharashtra
December 07, 2025

The Prime Minister, Shri Narendra Modi has expressed deep grief over the loss of lives due to a mishap in Nashik, Maharashtra.

Shri Modi also prayed for the speedy recovery of those injured in the mishap.

The Prime Minister’s Office posted on X;

“Deeply saddened by the loss of lives due to a mishap in Nashik, Maharashtra. My thoughts are with those who have lost their loved ones. I pray that the injured recover soon: PM @narendramodi”