Youth brings energy and idealism that is unparalled: PM Modi
Poverty is one of the biggest challenges for any developing country: PM Modi
Malnutrition, unemployment, corruption & filth pose challenges for our country: PM
We can and we will build a Swachh Bharat: PM Modi

Addressing the Global Citizens Festival, PM Narendra Modi said youth brings energy and idealism that is unparalled. PM Modi spoke about how the Government at Centre has been undertaking several initiatives for welfare of people.

Shri Modi said that poverty is one of the biggest challenges for any developing country. He also said that malnutrition, unemployment, corruption & filth too posed challenges for the country. He called for people to work together towards a Swachh Bharat. “I am convinced we can and we will build a Swachh Bharat free of all forms of filth within one generation”, he added.

Explore More
Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya

Popular Speeches

Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya
India's manufacturing outlook remains resilient despite global headwinds; machine tools, metals and auto lead optimism

Media Coverage

India's manufacturing outlook remains resilient despite global headwinds; machine tools, metals and auto lead optimism
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves a Road Construction project in Uttar Pradesh worth Rs.7145.14 crore
July 01, 2026

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved the construction of 117.7 km Kanpur–Kabrai Access-Controlled Greenfield Highway, a four-lane access-controlled corridor with structures designed for future six-laning, forming a key segment of the Bhopal–Kanpur Economic Corridor under the National Highways (O) Programme. With an estimated total capital cost of Rs.7145.14 crore, the project will be implemented by the National Highways Authority of India (NHAI) on BOT (Toll) mode, together with the operation and maintenance of the existing Kanpur-Kabrai section of NH-34.

The project will provide seamless, high-speed connectivity between Kanpur and Kabrai, while strengthening onward connectivity to Sagar, Bhopal and other parts of Madhya Pradesh, thereby creating a modern access controlled economic corridor linking the industrial and commercial centres of Uttar Pradesh with mineral-rich, manufacturing and agricultural regions of Madhya Pradesh thereby improving.

Designed for operating speeds of 80–100 kmph, the corridor will reduce travel time between Kanpur and Kabrai from 3.5 hours to 1.5 hours (58%), while improving road safety, reducing vehicle operating costs and facilitating efficient movement of passenger and freight traffic. The project will also provide strategic connectivity with NH-34, NH-35, the Bundelkhand Expressway, Kanpur Ring Road, and State Highways SH-46, SH-91, SH-10B and SH-42, thereby strengthening integration with the regional highway network. The corridor further strengthen connectivity to the Kabrai mining belt, improving the movement of minerals, industrial goods, construction materials and agricultural produce, thereby enhancing logistics efficiency, supply chain resilience and regional economic development.

Aligned with the PM GatiShakti National Master Plan, the project will improve connectivity to 16 Economic Nodes, including the Unnao, Banther, Pankhi, Rania, Jainpur, Rooma, Chakeri, Sumerpur and Bhuragarh Industrial Areas, Trans Ganga Integrated Township, Growth Centre Jaipur, Kanpur Nagar Node and Bengal Chemicals & Pharmaceuticals Ltd. It will also strengthen connectivity to 9 Social Nodes, namely Fatehpur, Mahoba, Kanpur Zoological Park, Buddha Park, J.K. Temple & Garden, Radha Krishna Temple, Siddheshwar Mahadev Temple, Gopeshwar Mandir and Mahoba Tourist Place, and 10 Logistics Nodes, including Kanpur, Ghatampur, Hamirpur, Mahoba, Kabrai, Bharwa Sumerpur and Banda Railway Stations, together with Kanpur, Chakeri and Khajuraho Airports.

Overall, improve logistics competitiveness, industrial development and economic growth across Bundelkhand and adjoining regions of Uttar Pradesh and Madhya Pradesh, while advancing the objectives of PM GatiShakti.

The project is expected to generate approximately 11,188 direct and 13,985 indirect person-days of employment per lane per km during construction and is projected to carry an Annual Average Daily Traffic (AADT) of about 18,069 Passenger Car Units (PCUs) by FY 2028, underscoring its long-term economic, logistics and transport significance. The proposed project will thus generate close to 1.2 Crore person-days of direct employment and indirect employment.

Map of Corridor: