PM to visit Tamil Nadu and Kerala on 14th February

Published By : Admin | February 12, 2021 | 18:10 IST

Prime Minister Shri Narendra Modi will visit the states of Tamil Nadu and Kerala on 14th February, 2021. At around 11:15 AM, Prime Minister will inaugurate and lay the foundation stones for several key projects and hand over the Arjun Main Battle Tank (MK-1A) to the Army, at Chennai. At around 3:30 PM, Prime Minister will lay the foundation stone and dedicate various projects to the nation, at Kochi. These projects will add crucial momentum to the growth trajectory of these states and help hasten the pace of realizing full development potential.

PM in Tamil Nadu

Prime Minister will inaugurate the Chennai Metro Rail Phase-I extension, completed at a cost of Rs. 3770 crore, and commission the passenger services from Washermenpet to Wimco Nagar. This 9.05 km long extension will link North Chennai with the Airport and Central Railway Station.

Prime Minister will inaugurate the fourth Railway line between Chennai Beach and Attipattu. This 22.1 km section, laid at a cost of Rs.293.40 crore, traverses through Chennai and Thiruvallur Districts and will ease out traffic from Chennai Port. This section connects the Chennai Port and Ennore Port and passes through major yards, providing operational flexibility for the movement of trains.

Prime Minister will also inaugurate the Railway Electrification of single line section in Villupuram - Cuddalore - Mayiladuthurai - Thanjavur and Mayiladuthurai-Thiruvarur. Completed at a cost of Rs. 423 crore, the electrification of this 228 km route will enable free flow of traffic without the need for a change of traction between Chennai Egmore and Kanyakumari and would result in saving of Rs.14.61 lakh per day on fuel cost.

During the event, Prime Minister will hand over the State-of-the-Art Arjun Main Battle Tank (MK-1A) to the Indian Army. This Battle Tank has been indigenously designed, developed and manufactured by CVRDE, DRDO along with 15 academic institutions, 8 labs and several MSMEs.

Prime Minister will lay the foundation stone for the extension, renovation and modernization of the Grand Anicut Canal System. The canal is important for irrigation in the delta districts. The modernization of this canal will be taken up at a cost of Rs.2,640 crore, and will lead to an improvement in the water carrying capacity of the canals.

Prime Minister will also lay the foundation stone for the Discovery Campus of IIT Madras. The Campus will be built at Thaiyur near Chennai at an estimated cost of Rs.1000 crore in the first phase, over an area of 2 lakh sqm.

Governor and Chief Minister of Tamil Nadu will also be present on the occasion.

PM in Kerala

Prime Minister will dedicate to the nation the Propylene Derivative Petrochemical Project (PDPP) of BPCL. The complex will produce Acrylates, Acrylic Acid and Oxo-Alcohol, which are at present predominantly imported, and is expected to result in saving of about Rs.3700 to 4000 crore/annum in foreign exchange. Constructed at a capital cost of about Rs 6000 crore, the PDPP Complex has been set up close to the refinery to achieve integration of feedstock supply, utilities, off-sites and other facilities. It will benefit the downstream sector in saving huge costs as a result of the ready availability of feedstock and optimized supply chain management. With the commissioning, Kochi Refinery has become the first Indian refinery to produce niche petrochemicals.

Prime Minister will also dedicate to the nation the Ro-Ro Vessels at Willingdon Islands, Cochin. The International Waterway Authority of India will deploy two new Roll-on/ Roll-off vessels between Bolgatty and Willingdon Island on National Waterway-3. The Ro-Ro vessels, MV Adi Shankara and MV CV Raman, will have the capacity to carry six 20-feet trucks, three 20-feet trailer trucks, three 40-feet trailer trucks and 30 passengers each. The service will benefit trade as a result of reduced transportation cost and transit time, and will also lead to reduced congestion on the roads of Kochi.

Prime Minister will inaugurate the International Cruise Terminal “Sagarika” at Cochin Port. Situated at the Ernakulam Wharf on Willingdon Island, it is India’s first full-fledged international cruise terminal. It has state-of-the-art facilities and has been constructed at a cost of Rs.25.72 crore. It will promote tourism, give a fillip to development and will act as an effective instrument for employment generation, earning revenue and foreign exchange.

Prime Minister will also inaugurate the Marine Engineering Training Institute, Vigyana Sagar, Cochin Shipyard Ltd. It is a premier Maritime Learning Centre and is the only Maritime institute in India functioning within a shipyard, having extended training facilities for trainees on various vessels under construction or repair. Constructed at a capital cost of Rs 27.5 crore, the institute has an intake capacity of 114 fresh graduates. It will create a talent pool of marine engineers and personnel to fulfill the requirement of the Maritime industry in India and abroad.

Prime Minister will also lay the foundation stone of Reconstruction of South Coal Berth at Cochin Port. It is being reconstructed at an estimated cost of Rs 19.19 crore under the Sagarmala Scheme. Upon completion, a dedicated berthing facility will be available for chemical handling at Cochin Port. Reconstruction of the Berth will ensure quick and efficient handling of cargo and reduced logistics cost.

Governor and Chief Minister of Kerala, along with Union Minister for Petroleum and Natural Gas will also be present on the occasion.

Explore More
Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya

Popular Speeches

Today, the entire country and entire world is filled with the spirit of Bhagwan Shri Ram: PM Modi at Dhwajarohan Utsav in Ayodhya
India records highest-ever startup surge with 55,200 recognised in FY26

Media Coverage

India records highest-ever startup surge with 55,200 recognised in FY26
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves two railway projects in Uttar Pradesh and Andhra Pradesh worth Rs 24,815 crore
April 18, 2026

The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, today has approved 02 (Two) projects of Ministry of Railways with total cost of Rs. 24,815 crore (approx.). These projects include:

Name of Project

Route Length (in km)

Track Length (in km)

Completion Cost (Rs. in Cr.)

Ghaziabad – Sitapur 3rd and 4th Line

403

859

14,926

Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line

 

198

 

458

 

9,889

Total

601

1,317

24,815

The increased line capacity will significantly enhance mobility, resulting in improved operational efficiency and service reliability for Indian Railways. These multi-tracking proposals are poised to streamline operations and alleviate congestion. The projects are in line with the Prime Minister Shri Narendra Modiji’s Vision of a New India which will make people of the region “Atmanirbhar” by way of comprehensive development in the area which will enhance their employment/ self-employment opportunities.

The projects are planned on PM-Gati Shakti National Master Plan with focus on enhancing multi-modal connectivity & logistic efficiency through integrated planning and stakeholder consultations. These projects will provide seamless connectivity for movement of people, goods, and services.

The 02 (Two) projects covering 15 Districts across the states of Uttar Pradesh and Andhra Pradesh will increase the existing network of Indian Railways by about 601 Kms.

The proposed capacity enhancement will improve rail connectivity to several prominent tourist destinations across the country, including Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), Naimisharanya (Sitapur), Annavaram, Antarvedi, Draksharamam, etc.

The proposed projects are essential routes for transportation of commodities such as coal, foodgrains, cement, POL, iron and steel, container, fertilizers, sugar, chemical salts, limestone, etc. The Railways being environment friendly and energy efficient mode of transportation, will help both in achieving climate goals and minimizing logistics cost of the country lowering CO2 emissions (180.31Crore Kg) which is equivalent to plantation of 7.33 Crore trees.

Ghaziabad – Sitapur 3rd and 4th Line (403 Km)

  • Ghaziabad – Sitapur is an existing double line section forming a key part of Delhi- Guwahati High Density Network (HDN 4).
  • The project is crucial for improving connectivity between the Northern and Eastern region of the country.
  • The existing line capacity utilization of the section is up to 168% and is projected to be up to 207% in case the project is not taken up.
  • Transverses through Ghaziabad, Hapur, Amroha, Moradabad, Rampur, Bareilly, Sahjahanpur, Lakhimpur Kheri and Sitapur districts of Uttar Pradesh.
  • The project route passes through major industrial centres - Ghaziabad (machinery, electronics, pharmaceuticals), Moradabad (brassware and handicrafts), Bareilly (furniture, textiles, engineering), Shahjahanpur (carpets and cement-related industries), and Roza (thermal power plant).
  • For seamless transportation, the project alignment is planned to bypass congested stations of Hapur, Simbhaoli, Moradabad, Rampur, Bareilly, Shahjahanpur, and Sitapur and accordingly, six new stations are proposed on the bypassing sections.
  • Key tourist/religious places along/near to the project section are Dudheshwarnath Temple, Garhmukteshwar Ganga Ghat, Dargah Shah Wilayat Jama Masjid (Amroha), and Naimisharanya (Sitapur) among others.
  • Anticipated additional freight traffic of 35.72 MTPA consisting of Coal, Foodgrains, Chemical Manures, Finished Steel, etc.
  • Estimated Cost: Rs.14,926 crore (approx.)
  • Employment generation: 274 lakh human-days.
  • CO2 emissions saved: About 128.77 crore Kg CO2 equivalent to 5.15 Cr trees.

  • Logistic cost saving: Rs. 2,877.46 crore every year vis-a vis road transportation.

Ghaziabad – Sitapur 3rd and 4th Line (403 Km)

Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line (198 Km)

  • Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) section forms part of the Howrah – Chennai High Density Network (HDN).
  • The proposed project is part of quadrupling initiative of Howrah – Chennai High Density Network (HDN) route.
  • The project traverses through East Godavari, Konaseema, Kakinada, Anakapalle and Vishakapatnam districts of Andhra Pradesh.
  • Visakhapatnam is identified as an Aspirational District in the Aspirational Districts Programme.
  • It provides connectivity to major ports along the East Coast such as Visakhapatnam, Gangavaram, Machilipatnam and Kakinada.
  • The project route runs along the eastern coastline and is among the busiest, predominantly freight-oriented sections of the East Coast Rail Corridor.
  • The line capacity utilization of the section has already reached up to 130%, leading to frequent congestion and operational delays. The line capacity is expected to increase further due to proposed expansion of ports and industries in the region.
  • Project section includes 4.3 km rail bridge over Godavari River, 2.67 km viaduct, 3 bypasses and the new alignment is around 8 km shorter than the existing route, improving connectivity and operational efficiency.
  • The proposed section will also boost tourism by improving access to key destinations such as Annavaram, Antarvedi and Draksharamam etc.
  • Anticipated additional freight traffic of 29.04 MTPA consisting of Coal, Cement, Chemical Manures, Iron and Steel, Foodgrains, Containers, Bauxite, Gypsum, Limestone, etc.
  • Estimated Cost: Rs.9,889 crore (approx.)
  • Employment generation: 135 lakh human-days.
  • CO2 emissions saved: About 51.49 crore Kg CO2 equivalent to 2.06 Cr trees.

  • Logistic cost saving: Rs. 1,150.56 crore every year vis-a vis road transportation.

 

आर्थिक सशक्तिकरण:

Aspirational districts - Visakhapatnam district will get improved connectivity

Additional economic opportunities in the region through tourism & industries.

Better healthcare and education for the citizens due to enhanced rail connectivity.


Rajahmundry (Nidadavolu) – Visakhapatnam (Duvvada) 3rd and 4th Line (198 Km)

Prime Minister’s focus on railways:

  • Record budget allocation of Rs. 2,65,000 crore for FY 26-27.
  • Manufacturing more than 1600 locomotives- surpassed US and Europe in manufacturing of locomotive production
  • In FY 26, Indian Railways is expected to rank among the top three freight carriers globally, moving 1.6 billion tonnes of cargo.

  • India starts exporting metro coaches to Australia and bogie to United Kingdom, Saudi Arabia, France and Australia.