Gujarat's Chief Minister Shri Narendrabhai Modi today sealed the 90-kg Time Capsule, scripting the progress of the state since its formation on May 1, 1960, and lowered it under the ground for posterity at the site of Mahatma Mandir here today.

The capsule, christened 'Kaal Sanduk' of 'Smriti Manjusha' is made of special gauge stainless steel after given proper treatment. The scripts are written on a 100-foot long, 3-foot wide special paper mixed with plastic. They have been written in Gujarati, Hindi, English and Sanskrit. It should last 1,000 years.

It contained 29 audio-visual compact discs prepared by the Government of Gujarat, Ravishankar Maharaj's word-by-word speech delivered at the time of Gujarat's Foundation Day on May 1, 1960, the concept of the Mandir and the opinion of 'kar sevaks' participating in its construction.

The capsule also carried proceedings of the state's golden jubilee celebration on May 1, 2010, the resolution passed by Gujarat's present and past Chief Ministers, MPs and MLAs at the unique parliamentary conclave, named 'Swarnim Gujarat Sanasadiya Parishad' held at the State Assembly on January 1, 2010.

Shri Modi lowered the capsule under the ground at 12.19 p.m., amidst chanting of Vedic hymns in the presence of the Council of Ministers, MPs, MLAs, Mayors and Sarpanchs from various cities and villages, among others.

Speaking on the occasion, Shri Modi said the centrally located Mahatma Mandir is being built on a site at the state capital so that it could be viewed from all directions by the elected representatives, administrators and others, continuously reminding them about the high ideals and values of the man of the millennium, the global citizen.

The majestic Mandir is being built by the people's strength with symbolic samples of soil and water brought in 50,000 pitchers from 26 nations, all the states in India, from all the 159 towns and 18,000 villages in Gujarat. The project has been undertaken as part of the state's golden jubilee celebration.

Explore More
ଶ୍ରୀରାମ ଜନ୍ମଭୂମି ମନ୍ଦିର ଧ୍ଵଜାରୋହଣ ସମାରୋହରେ ପ୍ରଧାନମନ୍ତ୍ରୀଙ୍କ ଅଭିଭାଷଣ

ଲୋକପ୍ରିୟ ଅଭିଭାଷଣ

ଶ୍ରୀରାମ ଜନ୍ମଭୂମି ମନ୍ଦିର ଧ୍ଵଜାରୋହଣ ସମାରୋହରେ ପ୍ରଧାନମନ୍ତ୍ରୀଙ୍କ ଅଭିଭାଷଣ
In a historic first, Constitution of India translated in Kashmiri

Media Coverage

In a historic first, Constitution of India translated in Kashmiri
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves Rs 1,526.21 crore upgrade of NH-326 in Odisha
December 31, 2025

The Union Cabinet chaired by the Prime Minister Shri Narendra Modi today approved the widening and strengthening of existing 2-Lane to 2-Lane with Paved Shoulder from Km 68.600 to Km 311.700 of NH-326 in the State of Odisha under NH(O) on EPC mode.

Financial implications:

The total capital cost for the project is Rs.1,526.21 crore, which includes a civil construction cost of Rs.966.79 crore.

Benefits:

The upgradation of NH-326 will make travel faster, safer, and more reliable, resulting in overall development of southern Odisha, particularly benefiting the districts of Gajapati, Rayagada, and Koraput. Improved road connectivity will directly benefit local communities, industries, educational institutions, and tourism centres by enhancing access to markets, healthcare, and employment opportunities, thereby contributing to the region’s inclusive growth.

Details:

  • The section of Mohana–Koraput of the National Highway (NH-326) at present have sub-standard geometry (intermediate lane/2-lane, many deficient curves and steep gradients); the existing road alignment, carriageway width and geometric deficiencies constrain safe, efficient movement of heavy vehicles and reduce freight throughput to coastal ports and industrial centres. These constraints will be removed by upgrading the corridor to 2-lane with paved shoulders with geometric corrections (curve realignments and gradient improvements), removal of black spots and pavement strengthening, enabling safe and uninterrupted movement of goods and passengers and reducing vehicle operating costs.
  • The upgradation will provide direct and improved connectivity from Mohana–Koraput into major economic and logistics corridors — linking with NH-26, NH-59, NH-16 and the Raipur–Visakhapatnam corridor and improving last-mile access to Gopalpur port, Jeypore airport and several railway stations. The corridor connects important industrial and logistic nodes (JK Paper, Mega Food Park, NALCO, IMFA, Utkal Alumina, Vedanta, HAL) and education/tourism hubs (Central University of Odisha, Koraput Medical College, Taptapani, Rayagada), thereby facilitating faster freight movement, reducing travel time and enabling regional economic development.
  • The project lies in southern Odisha (districts of Gajapati, Rayagada and Koraput) and will significantly improve intra-state and inter-state connectivity by making vehicle movement faster and safer, stimulating industrial and tourism growth and improving access to services in aspirational and tribal areas. Economic analysis shows the project’s EIRR at 17.95% (base case) while the financial return (FIRR) is negative (-2.32%), reflecting the social and non-market benefits captured in the economic appraisal; the economic justification is driven largely by travel-time and vehicle-operating-cost savings and safety benefits (including an estimated travel-time saving of about 2.5–3.0 hours and a distance saving of ~12.46 km between Mohana and Koraput after geometric improvements).

Implementation strategy and targets:

  • The work will be implemented on EPC mode. Contractors will be required to adopt proven construction and quality-assurance technologies, which may include precast box-type structures and precast drains, precast RCC/PSC girders for bridges and grade separators, precast crash barriers and friction slabs on Reinforced-Earth wall portions, and Cement Treated Sub-Base (CTSB) in pavement layers. Quality and progress will be verified through specialized survey and monitoring tools such as Network Survey Vehicle (NSV), periodic drone-mapping. Day-to-day supervision will be carried out by an appointed Authority Engineer and project monitoring will be conducted through the Project Monitoring Information System (PMIS).
  • The work is targeted to be completed in 24 months from the appointed date for each package, followed by a five-year defect liability/maintenance period (total contract engagement envisaged as 7 years: 2 years construction + 5 years DLP). Contract award will follow after completion of statutory clearances and required land possession.

Major impact, including employment generation potential:

  • This project is aimed at providing faster and safer movement of traffic and improving connectivity between the southern and eastern parts of Odisha, particularly linking the districts of Gajapati, Rayagada, and Koraput with the rest of the State and neighbouring Andhra Pradesh. The improved road network will facilitate industrial growth, promote tourism, enhance access to education and healthcare facilities, and contribute to the overall socio-economic development of the tribal and backward regions of southern Odisha.
  • Various activities undertaken during the construction and maintenance period are expected to generate significant direct and indirect employment opportunities for skilled, semi-skilled and unskilled workers. The project will also boost local industries involved in the supply of construction materials, transportation, equipment maintenance, and related services, thus supporting the regional economy.
  • The project is located in the State of Odisha and traverses three districts — Gajapati, Rayagada, and Koraput. The corridor connects major towns such as Mohana, Rayagada, Laxmipur, and Koraput, providing improved intra-state connectivity within Odisha and enhancing inter-state linkage with Andhra Pradesh through the southern end of NH-326.

Background:

Government has declared the stretch “the Highway starting from its junction with NH-59 near Aska, passing through Mohana, Raipanka, Amalabhata, Rayagada, Laxmipur and terminating at its junction with NH-30 near Chinturu in the State of Odisha” as NH-326 vide Gazette Notification dated 14th August 2012.