Guj Annual Plan for 2012-13 finalized at Rs. 51,000 crore: 34.21% higher than last fiscal
June 01st, 07:27 pm
June 01st, 07:27 pm
India is building the capacity to design and manufacture at every level of the semiconductor value chain: PM Modi in Sanand, Gujarat
PM Modi inaugurates the Kaynes Semicon Plant at Sanand, Gujarat
LDF and UDF have looted Keralam for decades through a tacit understanding: PM Modi in Palakkad, Keralam