बीते 100 दिनों में 15 लाख करोड़ रुपये से ज्यादा की योजनाओं पर काम शुरू हुआ: अहमदाबाद में पीएम मोदी
September 16th, 04:30 pm
September 16th, 04:30 pm
Cabinet approves revised cost estimate for the construction of Greenfield Connectivity in Uttar Pradesh and Haryana
Cabinet approves 4-laning of Badnawar–Timarwani NH-752D stretch of the Delhi Mumbai expressway in Madhya Pradesh
Cabinet approves two multitracking projects covering 5 Districts of West Bengal and Jharkhand, increasing the existing network of Indian Railways by about 192 Kms